Title Page

  • Site conducted

  • Job Number

  • Conducted on

  • Prepared by

  • Location
  • Nearest main or cross road

Audit

Front of job site inspection - must take photos

  • Front of site photo

  • Damage to vehicle crossover at job site?

  • Damage to footpath bays in front of job site?

  • Damage to curb and channel in front of job site?

Left of job site inspection - must take photos

  • Front of site photo

  • Damage to vehicle crossover at job site?

  • Damage to footpath bays in front of job site?

  • Damage to curb and channel in front of job site?

Right of job site inspection - must take photos

  • Front of site photo

  • Damage to vehicle crossover at job site?

  • Damage to footpath bays in front of job site?

  • Damage to curb and channel in front of job site?

Onsite inspection

  • Are there items that need to be removed from site. Please write down what needs to be removed. EG contaminated soil or rubbush

  • Does grass need to be mowed by the owner?

  • Locate front right survey peg

  • Locate front right survey peg

  • Locate left rear survey peg

  • Locate right rear survey peg

  • Are there additional pegs found for irregular blocks?

  • If the pegs are not identified is a re-establishment survey required?

  • Are there any overhead powerlines/services present?

  • Has a “no go zone permit” application been submitted?

  • Is water tapping complete and operational?

  • Is traffic control required?

  • Are there any underground services visible (EG: old gas meter pipes)

  • Is the electricity pit in place?

  • Are there any existing fencing adjacent to the site?

  • Does the fence need to be removed along the garage?

  • Are there any retaining walls onsite?

  • Will there be any issues arising from undermining?

Adjacent Properties

Adjacent site details - Left hand boundary

  • Is the site vacant, developed or under construction?

  • Stage of job

  • Is the garage within 1m of boundary

  • Is the garage on the boundary?

  • What is the length of the garage on the boundary?

  • What is the setback of the adjoining garage if on the boundary?

  • Is there a retaining wall on the boundary?

  • Height and length of wall?

  • Is there any damage to existing fences or structures?

  • Any other concerns

Adjacent site details - Right hand boundary

  • Is the site vacant, developed or under construction?

  • Stage of job

  • Is the garage within 1m of boundary

  • Is the garage on the boundary?

  • What is the length of the garage on the boundary?

  • What is the setback of the adjoining garage if on the boundary?

  • Is there a retaining wall on the boundary?

  • Height and length of wall?

  • Is there any damage to existing fences or structures?

  • Amy other concerns?

Adjacent site details - Rear boundary

  • Is the site vacant, developed or under construction?

  • Stage of job

  • Is there any damage to existing fences or structures?

  • Any other concerns?

Signature

  • Inspector

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.