Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Project Contract Details
-
Site Address
-
Photo of Site Entrance
-
Client Details
Client
-
Client
-
Client Contact
-
Site Contact
-
Welfare?
-
What and supplied by who?
-
Other Sub-contract Works?
-
Other Sub-Contractors
Sub-Contractors
-
Sub Contractor Details
-
Analyst Requirements
Analyst Requirements
-
Who?
-
What?
Waste Management
-
Waste Management
-
How many bags?
-
Skip or collection?
-
How many bags?
-
Who?
-
Add media
Project Details
-
Are the works Non-Notifiable?
-
Scope of Works
-
Comments
-
Site Survey Details
-
Additional Site PPE
- Appropriate Gloves
- Hi-Viz
- Hard Hat
- Safety Glasses
- Other
-
What?
-
Site Parking
-
Site Parking Location
-
Parking Photo
-
DCU required?
-
Attached to the enclosure
-
Location Details
-
Location Photo
-
Power
-
Water
Pre-Start Checks
-
Pre-Start Checks? (e.g. Isolations, site temps etc.)
-
Comments
-
Asbestos to be removed
- rope
- gasket
- cement
- floor tiles
- artex
- AIB
- sprayed insulation
- insulation to pipework
- other
-
What?
Respirator Zone
-
Access Equipment
- Hop-ups
- Steps
- Podium Steps
- Access Towers
- Scaffolding
-
Fixings
- screw
- nail
- n/a
-
Pre-Clean?
-
What and Where
-
Enclosure Sheeting
- Building Fabric
- Timber Studwork
-
Airlock & Baglock
-
Why?
-
Airlocks/Baglock Construction
-
What Size?
-
Vision Panels and/or CCTV
- Vision Panels
- CCTV
-
Negative Pressure Unit Vented to Atmosphere
-
Why?
-
Negative Pressure Unit With Roving Head
-
Height x Width x Length
Comments
-
Comments
-
Photo
-
Are the works Notifiable?
-
Scope of Works
-
Comments
-
Site Survey Details
-
Additional Site PPE
- Appropriate Gloves
- Hi-Viz
- Hard Hat
- Safety Glasses
- Other
-
What?
-
Site Parking
-
Site Parking Location
-
Parking Photo
-
Skip requirement
-
Skip Size
-
Skip Location
-
Skip Location Photo
-
Decontamination Unit
DCU
-
Attached to the enclosure
-
Location Details
-
Location Photo
-
Power
-
Water
Pre-Start Checks
-
Pre-Start Checks? (e.g. Isolations, site temps etc.)
-
Comments
-
Enclosure Details
Enclosures
-
Asbestos to be removed
- rope
- gasket
- cement
- floor tiles
- artex
- AIB
- sprayed insulation
- insulation to pipework
- other
-
What?
-
Access Equipment
- Hop-ups
- Steps
- Podium Steps
- Access Towers
- Scaffolding
-
Fixings
- screw
- nail
- n/a
-
Pre-Clean?
-
What and Where
-
Enclosure Sheeting
- Building Fabric
- Timber Studwork
-
Airlock & Baglock
-
Why?
-
Airlocks/Baglock Construction
-
What Size?
-
Vision Panels and/or CCTV
- Vision Panels
- CCTV
-
Negative Pressure Unit Vented to Atmosphere
-
Why?
-
Negative Pressure Unit With Roving Head
-
Height x Width x Length
Comments
-
Comments
-
Photo
Risk Assessments
-
Asbestos
-
Comments
-
Photo
-
Live Mechanical Services
-
Comments
-
Photo
-
Live Electrical Services
-
Comments
-
Photo
-
Confined space
-
Comments
-
Photo
-
Poor Lighting
-
Comments
-
Photo
-
Electric Plant & Equipment
-
Comments
-
Photo
-
Slips, Trips & Falls
-
Comments
-
Photo
-
Noise
-
Comments
-
Photo
-
Hand Cutting Timber
-
Comments
-
Photo
-
Hand Tools
-
Comments
-
Photo
-
Power Tools Cutting/Grinding
-
Comments
-
Photo
-
Hand Arm Vibration (HAVS)
-
Comments
-
Photo
-
Hand Cutting Timber
-
Comments
-
Photo
-
Manual Handling
-
Comments
-
Photo
-
Fire
-
Comments
-
Photo
-
Working At Height
-
Comments
-
Photo
-
Needles & Sharps
-
Comments
-
Photo
-
Vehicle Movements & Deliveries
-
Comments
-
Photo
-
Drug Use
-
Comments
-
Photo
-
Bio-Hazard (vermin/animal infestation)
-
Comments
-
Photo
-
Pigeon Guano
-
Comments
-
Photo
-
Dry Ice
-
Comments
-
Photo
-
Other
Other RA's
-
Add media
Drawing
-
Add drawing
-
Add media
Additional Infomation
-
Add media
Caswell Group Representative Signature
-
- Stephen Summerfield
- Carl Lewis
- Mark Barker
- Gordon Averall
- Carl Caswell
- Other
-
Who?
-
Add signature