Title Page
-
Site conducted, including picture of the building for the Rams.
-
Conducted on
-
Prepared by
-
Location
Pre-start checklist
-
Please state the full scope of works
-
What time can the team start? Take photos of any keys, fobs or codes for access needed.
-
If there is a specific area only in this task please identify, including a small narrative of the area
-
Is there a water supply within the work area?
-
Please take photos of the entry/exit to the roof area, including a narrative of how to get to the roof.
-
How many floors is the building?
-
How much rope is needed, is there anything outside of standard rope access equipment required?
-
Is there parking on site? Please take a photo
-
Is the roof safe from any risk of RF in the working area? Take photos of reader I possible.
-
Is the roof safe from any risk of contamination I.e pigeon guano?
-
What is the means of anchorage? If portable anchorage please take photos of the parapet that meets manufacture guidelines
-
Are there any access limitations or time restrictions?
-
Does the building have any overhangs?
-
Please indentify any abrasive edges and highlight control measures to put in place
-
Is the leading edge suitable for rope access
-
-
How many man days do you think the work will last?
-
Is there any factors that would increase the costs I.e use of hot pressure washer
-
Please indentify any hazards on the roof with photo evidence
Completion
-
Pre-start completed