Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location

Demolition

  • Is this a KDRB site?

  • Add media

  • Is site already clear?

  • Add media

Rubbish/Debris

  • Is this site clear of rubbish and other debris?

  • Add media

  • Is this site currently clear of grass and vegetation?<br>

  • Add media

  • is the site clear of trees that will need to be removed or trimmed for construction?

  • Add media

Fencing

  • What is the condition of the fence to rear

  • Add media

  • What is the condition of the fence to left hand side

  • Add media

  • What is the condition of the fence to right hand side

  • Add media

  • What is the condition of other fencing

  • Add media

Road, Kerb and Footpath

  • Is the kerb free from damage?

  • Add media

  • Is the road free from damage?

  • Add media

  • Is the footpath free from damage?

  • Add media

Retain Walls and Drop Edge Beam

  • If existing retaining walls present, what is the condition?

  • Add media

  • Will this site require retaining walls and or drop edge beam that should be allowed for in tender?

  • Add media

  • Will this site require import OR export of fill?

  • Is this site clear of rock?

  • Add media

WH&S

  • Is this site clear of overhead power lines that will affect deliveries?

  • Add media

  • Is this site clear of traffic hazards that will affect deliveries and require traffic control?

  • Add media

  • Is this site in a busy area that will need a construction zone for parking?

  • Add media

  • Will this site require additional crane hire?

  • Add media

  • Is this site free from other issues that will require additional site allowances? (nominate issues. i.e tight access, steep site)

Additional Information

  • Could this site be sewer affected?

  • Could this site require marine grade building elements?

  • Is there water on site?

  • Add media

  • Will scaffold shadecloth be needed?

  • Sketch boundary where site fence will be required? (nominate estimate LM)

  • Add drawing

  • Is there any additional power requirements if site is a duplex

  • Any further information or site notes.

Sign Off

  • What plans and information was supplied to compile this report?

  • Are all areas of the above report inspected and considered for the type of build to be constructed on this site

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.