Information
-
Address
-
Client
-
Company
-
Employee Name
-
Licence Number
-
Add location
-
Conducted on
Preliminary Checks
-
Complete risk assessment before commencing
-
Copy photo of risk assessment from pdf expert to camera
-
Has walk through been completed and plan signed off
-
Is pre - wire ready ( plumber complete, all carpentry complete)
-
If yes to all items above proceed
Variations
-
Are there any variations
-
Variations
All variations must be entered on a variation form and signed off by client
Upload variation form and attached above
Wiring Stage
-
Mark out all points and drill and bracket - see below for item heights
-
Heights
Sub - Board - 1400mm
GPO - 300mm
Garage GPO / Weather Proof GPO - 500mm
Garage Motor GPO - next to motor mounting timber
Fridge / Range hood GPO - 1700mm
Washing Machine - 1200mm
Kitchen/ bathroom GPO - 1050mm
Bathroom GPO ON Adjacent wall - 1200mm
Air Con Iso - 1000mm
Light sw - 1100mm
Hot water - 300mm -
Are all items wired as per plan <br>
-
Check correct amount of cables are present at Switchboard/Sub-board
-
Have all items been wired as per AS 3000
-
Have all points are marked with spray paint on floor ( don't spray garage floor)
-
Have all light measurements been marked on plan
-
Are all smoke detectors, ceiling fans, air con iso's, weather proof GPO 's, wall lights etc been left in a manner to be pulled trough during plastering, brickwork or cladding
-
Have all cables been taped together
-
Has TV Aerial been mounted and wired
Final checks
-
Has a final walk through been completed checking plan and item positions
-
Has site been cleaned with site sweep up and all off cuts put in skip
-
Is site ready to be sheeted / clad
-
Add any items here which are incomplete
-
Add any photos here for any items that need attention
-
Add signature
-
Add completed file to Dropbox in its correct location.