Audit

Add location
Select date
Site Safety

Is site clean of all Holby Waste

Temp Switchboard

All Cables are terminated safety

Live Tape is on Mains conduit and Earth Stake is sprayed

NBN Conduits are correctly located below the MSB

Board is correctly labeled and site map is present in board

Pre Wire

Cables ends are taped inside MSB

Antenna and Splitter is mounted

All external cables are away from down pipes etc

All cabling is clipped or supported correctly

Stove Iso is wired correctly

Fit Off Stage

External lights are straight and level and as per plan

Switchboard has been labeled - sticker present - pole fillers inserted - earth stake neat and against wall

NBN conduits are position correctly - hub has been completed (if on plan)

External Vents and ducting are complete

RE check Antenna and Splitter

Check all wall, ceilings, switches, power points etc are free from finger marks and straight and level

All smoke alarms have green light so some AC power is connected

All isolators have been connected and correctly positioned

Photos / Drawings
Add drawing
Add media
Please note that this checklist is a hypothetical example and provides basic information only. It is not intended to take the place of, among other things, workplace, health and safety advice; medical advice, diagnosis, or treatment; or other applicable laws. You should also seek your own professional advice to determine if the use of such checklist is permissible in your workplace or jurisdiction.