Information
-
Address
-
Client / Site
-
Completed by
-
Conducted on
-
Location
-
Add location
-
Select date
Site Safety
-
Is site clean of all Holby Waste <br>
Temp Switchboard
-
All Cables are terminated safety<br>
-
Live Tape is on Mains conduit and Earth Stake is sprayed<br>
-
NBN Conduits are correctly located below the MSB<br>
-
Board is correctly labeled and site map is present in board<br>
Pre Wire
-
Cables ends are taped inside MSB
-
Antenna and Splitter is mounted
-
All external cables are away from down pipes etc<br>
-
All cabling is clipped or supported correctly<br><br>
-
Stove Iso is wired correctly
Fit Off Stage
-
External lights are straight and level and as per plan
-
Switchboard has been labeled - sticker present - pole fillers inserted - earth stake neat and against wall
-
NBN conduits are position correctly - hub has been completed (if on plan)
-
External Vents and ducting are complete
-
RE check Antenna and Splitter
-
Check all wall, ceilings, switches, power points etc are free from finger marks and straight and level
-
All smoke alarms have green light so some AC power is connected
-
All isolators have been connected and correctly positioned
Photos / Drawings
-
Add drawing
-
Add media