Information

  • Address

  • Client / Site

  • Completed by

  • Conducted on

  • Location
  • Add location
  • Select date

Site Safety

  • Is site clean of all Holby Waste <br>

Temp Switchboard

  • All Cables are terminated safety<br>

  • Live Tape is on Mains conduit and Earth Stake is sprayed<br>

  • NBN Conduits are correctly located below the MSB<br>

  • Board is correctly labeled and site map is present in board<br>

Pre Wire

  • Cables ends are taped inside MSB

  • Antenna and Splitter is mounted

  • All external cables are away from down pipes etc<br>

  • All cabling is clipped or supported correctly<br><br>

  • Stove Iso is wired correctly

Fit Off Stage

  • External lights are straight and level and as per plan

  • Switchboard has been labeled - sticker present - pole fillers inserted - earth stake neat and against wall

  • NBN conduits are position correctly - hub has been completed (if on plan)

  • External Vents and ducting are complete

  • RE check Antenna and Splitter

  • Check all wall, ceilings, switches, power points etc are free from finger marks and straight and level

  • All smoke alarms have green light so some AC power is connected

  • All isolators have been connected and correctly positioned

Photos / Drawings

  • Add drawing

  • Add media

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.