Information
-
Site conducted
-
Audit Title
-
Document No.
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Select date
-
Take a Photo of the Site Sign
Certifications: (list employee certifications / Tower Rescue, CPR/FA) (list personnel certified)
-
If climbing is being conducted are two or more employees on site Tower Rescue Certified?
-
Are two or more employees on site CPR/FA certified?
-
Is employee using hoist qualified/certified?
-
Are employees certified in rigging?
-
Are employees certified in confined space entry?
Emergency Contacts
-
Cell phone coverage?
-
Are 911 systems functional / cell phone?
-
Phone number and address for local Police, Fire and ER
Rescue Procedures (explain rescue procedures under selection)
-
Outside Services?
-
Heavy Equipment?
-
Friction Control Device?
-
Internal Crew?
-
Other? (describe)
Job/Tasks for Scope (describe job tasks under selected category)
-
Tower Construction/Survey?
-
Electrical?
-
Civil/Concrete?
-
Drilling?
-
Bridge Construction/Survey?
-
Foundation Construction/Survey?
-
Other? (describe)
Jobsite Exposures Physical Hazards (select and explain abatement on all that apply)
-
Confined Space?
-
Dropped Tools/Equipment?
-
Electrical?
-
Elevation/Site Terrain?
-
Fall from Elevation/Roof Edge?
-
Fire Hazard?
-
Navigable Waters?
-
Heavy Equipment?
-
Overhead Utilities?
-
Slips, Trips, Falls?
-
Underground Utilities?
-
Vehicle Traffic?
-
Other? (describe)
Jobsite Exposures Health Hazards (select and explain abatement on all that apply)
-
Biological Hazards?
-
Chemical Exposures?
-
EME/RFR?
-
Environmental Hazards?
-
HazMat Exposure/Disturbance?
-
Heat Stress/Cold Stress?
-
High Noise (> 85 dBA)?
-
Lifting Hazards?
-
Silica Exposure?
-
Other? (describe)
Civil Work
-
Describe the type and depth of excavation:
-
Have private utility locates been completed where required?
-
Have utilities been located where core boring/drilling is required?
-
Public utility locate work order number along with effective and expiration dates:
-
Have all owner identified underground obstructions been located & marked?
-
Describe the cave-in control measures to be used if excavation will be greater than 5 feet personnel are entering the trench (sloping, benching, shoring, shield/box, ladder in trench at 4 feet):
-
Describe elevation/site terrain/environmental concerns or hazards:
-
Describe hazards with site/vehicle access (e.g. boom and cranes/electrical lines) and storage of materials:
-
Describe the type of electrical hazards:
Elevated Work
-
Type of Elevated Work Location:
-
Type of Antenna Boom(s):
-
Anchorage Straps Used?
-
Controlled Descent Devices?
-
Retractable Lifelines?
-
Rope Grab?
-
Cable Grab?
-
Y-Lanyards?
-
Full Body Harness?
-
Other: (describe)
-
Site Supervisor/Foreman:
-
Lower Tier Subcontractor Supervisor:
-
Visitor(s):
-
Date and Time of Visitor(s):