Information
-
Job Address
-
Job Number
-
Land Status
-
Client Name
-
Council
-
CSR
-
Conducted on
-
Prepared by
-
Location
Preconstruction Advice
-
Survey pegs available (front and rear)
-
Is re-establishment survey required
-
Does the grass need cutting prior to commencement
-
Is rubbish on property
-
Is the Property fenced
-
Is there Adequate access to property
-
Is there steep access (double handling)
-
Is the footpath broken (mark on site plan)
-
Is the crossover broken (mark on site plan)
-
Will additional retaining be required?
Existing Infrastructure
-
Is there overhead services on site which cause a risk to construction or deliveries
-
Is there underground services/utilities that cause a risk to construction
Traffic Management
-
Is there access restrictions
-
Is there disruption to traffic/pedestrian movement
-
Is there ability to erect plant, scaffolding etc
-
Is there disruption to public transport
Site Surroundings
-
Does the proximity to adjoining property/buildings impede construction
-
Are there any Workplace/site restrictions
-
Is there surrounding occupancies, such as other residential (with respect to risks of noise, dust, working hours etc)
Security
-
Is there significant risk of trespass to site
-
Is it an Isolated location
Animal Wildlife
-
Is the site in a fire ant zone
-
Is there any presence of fire ant activity
Photographs for Pre-Construction Design Checklist
-
Add media
Site Plan - any damage
-
(Victorian Project only need to Draw top view of site plan if damage is found on property). Mark an "X" in the location of the damaged footpath bay and vehicle crossing bay. Draw in the position of the vehicle cross over bay and parking bay if applicable. Photographs must also be supplied of any damage. Please note the number of footpath bays damaged if applicable.
-
Add media
Preworks Technical Assessment completed by
-
Position
-
Signature
-
Select date