Information

  • Document No.

  • Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Project Name:

  • Preposed start date

  • Description of building to be building (i.e. four story with retail)

Dimensions

  • Height

Materials

  • Foundation:

  • Walls:

  • Floors:

  • Demolition Required

  • Potential external hazards ( occupied buildings, close proximity to an airport etc.):

  • Hazards requiring additional Safety Analysis:

  • Item #s requiring Professional Engineer input:

Safety Exposures

  • Natural gas lines

  • Electrical lines

  • Water lines

  • Fiber optic cables

  • Other utilities

  • Fire hazards

  • Adjacent walkways

  • Adjacent roadways

  • Adjacent buildings

  • Railroad tracks and crossings

  • Heavy equipment hazards

  • Confined space hazards

  • Shoring required

  • Basement

  • Open pits or trenches

  • Manholes to preserve

  • Fall hazards

  • Lead exposure

  • Process hazards

  • Utilities to disable

  • Pre-existing structural damage

  • Environmental issues

  • Other safety issues

  • I have reviewed this preliminary survey with the safety department and have had the opportunity to have it amended to include any additional concerns that I have identified.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.