Title Page
-
Address
-
Retrofit Assessor
- PETER OLD - Trustmark ID: 1794838
- MARC DAVIES - Trustmark ID: 2440543
- SARA TAYLOR - Trustmark ID: 2727705
- TYLER NAYLOR - Trustmark ID: 2825731
- STEVE BRIGHT - Trustmark ID: 1978044
- GAVIN BYRNE - Trustmark ID: 2329255
- KEVIN SCHOUTEN - Trustmark ID: 2006205
- RYAN HAIDER - Trustmark ID: 2467504
- JOHN CALWAY - Trustmark ID: 1798136
- STEPHEN LEE - Trustmark ID: 1795458
- JAKE BARLOW - Trustmark ID: 2578126
- TOM DUNCAN - Trustmark ID: 2276755
- MATTHEW DAVIES - Trustmark ID: 1882752
- JONATHAN CROFTON - Trustmark ID: 2642218
- ROY HEANEY - Trustmark ID: 2019714
- DANIEL BROTHERS - Trustmark ID: 1942017
- SYED SHAH - Trustmark ID: 1985225
- DEMI-LEE WARMER - Trustmark ID: 2651423
- SIMON MCINTYRE - Trustmark ID: 2352606
- CHAD BRIGGS - Trustmark ID: 2019157
- MICHAEL CURWOOD - Trustmark ID: 2660558
- HARRIS QUAYUM - Trustmark ID: 2341906
- LEE GREGORY - Trustmark ID: 1822416
- SUHEL CHUNARA - Trustmark ID: 1877531
- DAVID FOX - Trustmark ID: 2329924
- STEVEN MCLEAN - Trustmark ID: 2475829
- PETER GIVEN - Trustmark ID: 1804132
- CHRIS ALLEN - Trustmark ID: 1984720
- PHIL TALLON - Trustmark ID: 2658706
- DEAN PRIOR - Trustmark ID: 2297803
- ANDREW GRUNDY - Trustmark ID: 2535224
- PAUL KING - Trustmark ID: 2560754
- ALEXANDER HARRIS - Trustmark ID: 2444206
- GREG RODDEN - Trustmark ID: 2501419
- NICK PRICE - Trustmark ID: 1997247
- MATTHEW LANGFORD - Trustmark ID: 1795804
- MARK GRIFFITHS - Trustmark ID: 2741814
- DAMIAN ROWLEY - Trustmark ID: 2586230
- JOHN GRIFFITHS - Trustmark ID: 2746755
- CHRIS HEARN - Trustmark ID: 2416441
- GIDION MAFINI - Trustmark ID: 2661436
- ANDREW CARPENTER - Trustmark ID: 2468039
- JAMIE DAVIES - Trustmark ID: 2726024
- MARK WATLING - Trustmark ID: 2679338
- DEVIN POPAT - Trustmark ID: 2686810
- GILES DAY - Trustmark ID: 2441154
- STEPHEN PRITCHARD - Trustmark ID: 2527350
- STEVEN LONG - Trustmark ID: 2490447
-
Retrofit Coordinator
- Level 5 Retrofit Coordinator - Peter Old | Trustmark ID: 2605521 (ECMK)
- Level 5 Retrofit Coordinator - Peter Old | Trustmark ID: 1794838 (Elmhurst)
- Level 5 Retrofit Coordinator - Peter Old | Trustmark ID: 2388418 (Stroma)
- LEWIS BURNARD of Carbon247 Retro Cordinator Service | Trustmark ID: 2535426
-
Retrofit Designer
- RETROFIT COORDINATOR
- DAVE MANNS of 2035 ASSESSMENTS will be the Retrofit Designer for this project MRICS, FCABE, MCIOB, MCIAT -Registered with CIOB Building Conservation Scheme - Trustmark Licence Number | 1950617
- DEAN HOLLOWAY of A&D Carbon Solutions will be the Designer for this project and is a Gas Safe Registered engineer - Registration Number | 554151
- ADAM SMITH of Euro Energy Group will be the Designer for the ESH part of this project and is a ECS Registered Electrician with a Level 3 NVQ Diploma in Installing Electrotechnical Systems and Equipment - Registration Number | C1021084
- RYAN KENNEDY of Ingenious ES will be the Designer for the ESH part of this project and is a Registered Electrician with a Level 3 NVQ Diploma in Installing Electrotechnical Systems and Equipment, along with GLEN DIMPLEX HEATING & VENTILATION who are the manufacturers of the product,
- TALISH DAD of Midlands Gas will be the Designer for this project and is a Gas Safe Registered engineer - Registration Number | 641215 & Licence No | 4955927
- OTHER
- PETER OLD of RENEWECO SOLUTIONS LTD will be the Retrofit Designer for this project and is a qualified Retrofit Coordinator (Level 5 Retrofit Coordination and Risk Management - February 2021)
-
Please provide name
-
PAS 2035 Path
-
Measures to be installed (Stage 1 only)
- Internal Wall Insulation (IWI)
- External Wall Insulation (EWI)
- Cavity Wall Insulation (CWI)
- Party Cavity Wall Insulation
- Loft Insulation (LI)
- Room-in-Roof Insulation (RIR)
- Flat Roof Insulation
- Floor Insulation (UFI)
- New Central Heating System (FTCH)
- Boiler Replacement
- Electric Storage Heater Replacement (ESH)
- Heating Controls
- Air Source Heat Pump
- Solar PV
Preliminaries
-
Retrofit Designer Qualifications
- Peter Old will be the Retrofit Designer for this project and is qualified as a Retrofit Coordinator (Level 5 Retrofit Coordination and Risk Management - February 2021)
- DEAN HOLLOWAY of A&D Carbon Solutions will be the Designer for this project and is a Gas Safe Registered engineer - Registration Number | 554151
- TALISH DAD of Midlands Gas will be the Designer for this project and is a Gas Safe Registered engineer - Registration Number | 641215 & Licence No | 4955927
- ADAM SMITH of Euro Energy Group will be the Designer for the ESH part of this project and is a ECS Registered Electrician with a Level 3 NVQ Diploma in Installing Electrotechnical Systems and Equipment - Registration Number | C1021084
- DAVE MANNS of 2035 ASSESSMENTS will be the Retrofit Designer for this project MRICS, FCABE, MCIOB, MCIAT -Registered with CIOB Building Conservation Scheme - Trustmark Licence Number | 1950617
-
Review Guidance
- The Retrofit Design has considered the guidance in Sections 4 & 5 of PAS2035 and will provide a 'fabric first' approach to retrofit. as far as is reasonably practicable.
-
Review assessment information
- The information that has been captured by the PAS Assessment and the Technical Assessments is sufficient to prepare the design
-
Retrofit Coordinator activities
- The Improvement Option Evaluation and Medium Term Plan for this project will be provided by the Retrofit Coordinator.
Retrofit Design
-
Scope of the design
- The scope of the design has been agreed with the Retrofit Coordinator. The intended outcomes are in line with the Energy Company Obligation (ECO) requirements and are intended to assist in reducing carbon emissions, maintaining security of energy supply and reducing fuel poverty.
-
PAS2035 Compliant Design
- Internal Wall Insulation (IWI)
- External Wall Insulation (EWI)
- Cavity Wall Insulation (CWI)
- Party Cavity Wall Insulation
- Loft Insulation (LI)
- Room-in-Roof Insulation (RIR)
- Flat Roof Insulation
- Floor Insulation (UFI)
- New Central Heating System (FTCH)
- Boiler Replacement
- Electric Storage Heater Replacement (ESH)
- Heating Controls
- Air Source Heat Pump
- Solar PV
-
-
This install must be completed in line with:
- CITB Loft Insulation Guide TRM 152-1 and all Knauf Earthwool Loft Roll 44 product data
-
-
The install must be completed in line with:
- the manufacturers instructions maintaining adequate ventilation and providing adequate provisions for lights, cabling, ducting and any other services within the loft space.
-
-
-
This install must be completed in line with:
- The IWI installation guidelines for the product and the BREG British Gypsum guidance.
-
Ventilation Assessment (Insulation Measures) - does it meet the PAS 2035 requirements?
-
If Yes:
- The ventilation assessment has identified that the existing ventilation system does meet the requirements of PAS2035.
-
If No:
- The ventilation assessment has identified that the existing ventilation system does not meet the requirements of PAS2035. The 'Ventilation Strategy' details the upgrade requirements for this retrofit project.
-
If N/A
- Ventilation upgrades are not a mandatory requirement as Non-Fabric measures only are being installed. Ventilation advice has been given.
-
Condition of the existing building
- A condition survey has been completed and this suggests that the property is in a good state of repair and that no remedial work is required prior to the installation of the measures.
- A condition survey has been completed and this suggests that the property is in need of repair and remedial work is required prior to the installation of the measures.
-
What remedial works are needed?
-
Planning Conditions - Is Planning Permission Required for EEM upgrade?
-
Please explain the Planning Permission Requirements
-
undefined
- The Installer/Client is responsible for obtaining the relevant permissions in order to carry out the proposed works.
-
Products & material specification
- The materials and products that have been specified are compatible with the building and each other. The manufacturers instructions for all products and materials to be used during this project are referenced in this design document.
-
Moisture Management
- The property is not over occupied
- The property is over occupied
-
Damp, Mould & Condensation
-
Where is this evident?
-
Physical interactions between measures
- Design details for measures that physically interact will be shown in the design details document. These are primarily taken from 'BR262 Thermal Insulation: Avoiding Risks' and must be followed to minimise thermal bridging and maintain airtightness.
- N/A
-
Resilience to rainwater ingress or flood
- The property is in a good state of repair, is in a moderate exposure area and has a very low flood risk.
-
Fire Safety
- The proposed measures should not compromise the fire safety of the building.
-
Maintenance requirements (Insulation)
- The fabric measures that are proposed have no ongoing maintenance requirements.
- Refer to MCS standards and system designer specification for maintenance requirements.
- Refer to the manufacturers technical specification for guidance on maintenance requirements.
-
Technical Standards
- The installer must install the measure in line with general guidance in PAS2030:2019 Sections 1 to 10 and the measure specific guidance in Annex B.
-
undefined
- Internal Wall Insulation (IWI)
- External Wall Insulation (EWI)
- Cavity Wall Insulation (CWI)
- Party Cavity Wall Insulation
- Loft Insulation (LI)
- Room-in-Roof Insulation (RIR)
- Flat Roof Insulation
- Floor Insulation (UFI)
- New Central Heating System (FTCH)
- Boiler Replacement
- Electric Storage Heater Replacement (ESH)
- Heating Controls
- Air Source Heat Pump
- Solar PV
-
undefined
- The installer must also ensure that the installation follows the guidance in the CITB Loft Insulation Guide and the Knauf Earthwool Loft Roll 44 Product.
-
undefined
- The installer must also ensure that the install must be completed in line with the Manufacturers Operations Manual and Kiwa BDA Agrement Certificate
-
Please select the heaters which are being installed?
- Dimplex Quantum QM050
- Dimplex Quantum QM070
- Dimplex Quantum QM100
- Dimplex Quantum QM125
- Dimplex Quantum QM150
- Dimplex FX20EIPX4 Downheater
-
undefined
- The installer must also ensure that the installation follows the guidance in the Dimplex Quantum Installation Specification documents
-
What Boiler is being installed?
-
undefined
- The installer must also ensure that the installation follows the guidance in the Manufacturers Installation Guide uploaded within the Retrofit Design attachments
-
undefined
- The installer must also ensure that the installation follows the guidance in the SWIP Operations Manual and the BDA Agrement Certificate.
-
undefined
- The installer must install the measure in line with the general guidance in MCS standards
-
What Heat Pump is being installed?
-
Sequence of Installation
- Any insulation measures and any required ventilation will be installed in the first phase. Other measures recommended in the Improvement Option Evaluation or Medium Term Improvement plan should be installed in the following order: fabric, airtightness, building services, renewables.
- Appropriate scaffolding to be erected at the site address for the installation of the Solar PV.
-
Operative Competency
- All installed measures will be installed by operatives with the relevant qualifications as detailed in Annex B of PAS 2030:19. Evidence of the Operative qualifications will be provided post install.
-
Testing & Commissioning
- All measures, once installed, will be Tested and Certified in-line with requirements set within Section 11 of PAS2030:2019. Results of the testing and commissioning, for the installed measures, will be provided post install.
-
Handover (All Measures)
- All installed measures must be physically inspected and their function and operation explained to the occupants
-
Handover (Ventilation)
- Information to be provided regarding cleaning and replacement of any air filters in mechanical ventilation systems and the consequences of switching off or disabling any installed ventilation systems.
Liaison with the Retrofit Installer regarding the Retrofit Design
-
Assessment and handover documents
- The Retrofit Installer will be provided with a copy of the Retrofit Assessment and the Retrofit Design.
-
Name of Installation Company
- EVOLVE HOME ENERGY SOLUTIONS | Trustmark ID: 1827508
- A&D CARBON SOLUTIONS | Trustmark ID: 1670135
- INGENIOUS ENERGY SOLUTIONS | Trustmark ID: 2620450
- INNOVATION SP | Trustmark ID: 2758929
- ENVIROMENTAL TECHNICAL SERVICES LTD | Trustmark ID: 1787540
- ZING ENERGY | Trustmark ID: 2362247
- RMS ENERGY SOLUTIONS LTD | Trustmark ID: 1720954
- RMS ENERGY SOLUTIONS LTD (CWI Only) | Trustmark ID: 2637920
- BIDCONNECTER LTD | Trustmark ID: 1730607
- EURO ENERGY GROUP | Trustmark ID: 1760151
- DYSON ENERGY SERVICES | Trustmark ID: 9315
- MAX ENERGY | Trustmark ID: 1732205
- TOTAL RENDER SOLUTIONS (SW) LTD | Trustmark ID: 2353208
- MIDLANDS GAS | Trustmark ID: 2407206
- DC ENERGY | Trustmark ID: 1732328
- LIVE MANAGE FACILITATE | Trustmark ID: 1669640
- CINERGI LTD | Trustmark ID: 2007846
- GRS INSULATION | Trustmark ID: 1763905
- INSTALLERS UK | Trustmark ID: 2557019
- GREENER ENERGY NORTH WEST LTD | Trustmark ID: 2133424
- SO ECO (NW) LTD | Trustmark ID: 2478536
- SOUTH COAST INSULATION SERVICES LTD | Trustmark ID: 14810
Declaration
-
I, Peter Old - Retrofit Coordinator declare that I have no conflict of interest.
-
The Role of the Retrofit Coordinator shall be to protect both the Client's interest and the public interest. The Retrofit Coordinator shall be responsible for overseeing the project from inception to completion, i.e. the Risk Assessment, the Dwelling Assessment, the Retrofit Design, the installation of improvement measures (in accordance with PAS2030), and post-completion Monitoring and Evaluation.
-
The Retrofit Coordinator may be employed by the Client, or by an organisation commissioned to undertake the assessment, design, installation, commissioning or monitoring and evaluation work (or a combination of these). Where a conflict of interest arises between the Retrofit Coordinator's duty to protect the Client's interest, the public interest and the employer's interest it shall be declared to the Client so that arrangements can be made to resolve it.
-
Signature
-
Trustmark Licence Number
- Level 5 Retrofit Coordinator - Peter Old | Trustmark ID: 2605521 (ECMK)
- Level 5 Retrofit Coordinator - Peter Old | Trustmark ID: 1794838 (Elmhurst)
- Level 5 Retrofit Coordinator - Peter Old | Trustmark ID: 2388418 (Stroma)
- LEWIS BURNARD of Carbon247 Retro Cordinator Service | Trustmark ID: 2535426