Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Survey resembles actual site
-
Photos taken and sent to Click
-
Water meter PLS position as per site plan
-
Water meter on site
-
Sewer invert position as per site plan
-
Council stormwater disposal (silt pit) on site
-
Communication Pit position as per site plan
-
Electrical dome position as per site plan
-
Rear Access
-
Gas/Electric meter box position correct Front/Rear
-
Street Kerb free of damage
-
If Kerb Damage present include photo
-
Footpath free of damage
-
If Footpath Damage present include photo
-
Is the block covered with large percentage of vegetation
-
Are their trees on the block or neighbouring properties that will pose an issue
-
Will mini digger or Hard dig be required
-
Retaining walls required
Existing Retaining Walls
-
Extent as per survey
-
Material type as per survey
-
In good condition
-
Will retaining require extending
-
Will edge protection be required prior works commence
Fences
-
Material as per survey
-
Are in good condition
-
Will need to be removed prior works commence
Access
-
Will access be an issue
-
Will concrete pump be required; soft sand, elevated,decline lot
-
Will material storage be a problem
-
Will traffic management be required