Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Survey resembles actual site

  • Photos taken and sent to Click

  • Water meter PLS position as per site plan

  • Water meter on site

  • Sewer invert position as per site plan

  • Council stormwater disposal (silt pit) on site

  • Communication Pit position as per site plan

  • Electrical dome position as per site plan

  • Rear Access

  • Gas/Electric meter box position correct Front/Rear

  • Street Kerb free of damage

  • If Kerb Damage present include photo

  • Footpath free of damage

  • If Footpath Damage present include photo

  • Is the block covered with large percentage of vegetation

  • Are their trees on the block or neighbouring properties that will pose an issue

  • Will mini digger or Hard dig be required

  • Retaining walls required

Existing Retaining Walls

  • Extent as per survey

  • Material type as per survey

  • In good condition

  • Will retaining require extending

  • Will edge protection be required prior works commence

Fences

  • Material as per survey

  • Are in good condition

  • Will need to be removed prior works commence

Access

  • Will access be an issue

  • Will concrete pump be required; soft sand, elevated,decline lot

  • Will material storage be a problem

  • Will traffic management be required

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.