Title Page
-
Conducted on
-
Prepared by
-
Location
Civil Works
Civil Works Preliminaries
Site Establishment
-
Compliance with procedures and requirements outlined in the Safety, Health & Environmental management System document and CHMP
-
Provision of all documents as required by the contract and legislative requirements; including but not limited to: OH&S plan, Quality plan
-
Activity Method Statements including risk assessments as may be required or requested by the Authority or Superintendent for working in, on or around existing services.
-
Insurances as required by the contract including but not limited to: Insurance of the works, Public liability.
-
Spotter and permits as required for working under or around live power under or any existing service as required.
Traffic Management
-
Liaise with Coucil and VicRoads to obtain an approved Traffic Management Plan
-
Implementation of TMP to include Traffic control and the provision of all necessary signage, VMS boards, lighting and barricading.
Environmental Management
-
Provide Environmental Management Plan to comply with all legislative requirements and to the satisfaction of Council, VicRoads and Superintendent.
-
Implementation of the contractors EMP including maintenance throughout the construction and maintenance period
Demolition and Site Preparation
-
Proving of all existing services
-
Temp site fencing; provide 1.8m chain mesh fence around stage boundary for duration of works.
Bulk Earthworks
-
Road Boxing
-
Grading
-
Topsoiling
-
Wetlands
Concrete Works
-
Kerb & Channel
Pavements
Rigid
-
Concrete Footpath
-
Concrete Crossovers
-
Concrete Islands
Flexible
-
Wearing Course
-
Intermediate Course
-
Base Course
-
Upper Subbase Course
-
Lower Subbase Course
-
Capping Layer
-
Subgrade
Testing
-
Arrangement and implementation of geotechnical testing of pavement course compaction including supply of test results, reports and retesting as necessary to establish compliance with the specifications
-
Arrangement and implementation of bituminous concrete testing of pavement mix composition and course compaction including supply of test results, reports and retesting as necessary to establish compliance with the specifications
Drainage
-
Are lids / covers as per design and set correctly?
-
Has CCTV been completed and approved by Council?
Trenching, Drain Installation and Backfilling
-
Are trench widths adequate for pipe size/ type?
-
Is the bedding material & thickness within tolerance and being compacted correctly?
-
Are pipes / pits being installed in accordance with design spec and manufacturers recommendations?
-
Are clearances to other services being maintained as per specication?
-
Does trench backll material and compaction comply with standard drawings and specications?
Delineation
-
Signage
-
Linemarking
Retaining Walls
-
Retaining Walls
-
Has the Contractor been issued with Sewer as-con drawings and are retaining wall footings being coordinated to avoid these services?
Sleeper Retaining Wall Works
-
Are retaining wall post holes dia / depth correct?
-
Are AG drains being connected to drainage system?
-
Is free draining material being backlled behind walls?
-
Are brackets for fence posts being installed?
Sewer
-
Sewer
-
Sewer Sub-Contractor:
Sewer OH&S
-
Is ground support suitable for the ground conditions and depth of excavation?
-
Are workers provided with a ladder or other means of access and egress where required?
-
Are trenches barricaded and made safe when left open (particularly overnight)?
-
Is lifting equipment suitable for the works being carried out?
-
Are materials as specied and stored correctly on site?
-
Are trench widths adequate for pipe size/ type?
Pipe Laying
-
Is the bedding material & thickness within tolerance and being compacted correctly?
-
Are pipes being installed in accordance with design
-
Are pipes being installed in accordance with design specication and manufacturers recommendations?
-
Are clearances to other services being maintained as per specification?
-
Are property branches being installed in accordance with the approved drawings and standards?
Backfilling
-
Does trench backfill material comply with standard drawings and specifications?
-
Is compaction testing being carried out by a NATA registered tester where required?
Sewer Access Structures
-
Has the concrete been placed and vibrated to specification?
-
Is the surface finish of manhole walls satisfactory?
-
Is mechanical compaction being carried out to specification within the support zone and around MH, MS, IS, Hydrants, Valves and Stormwater Pits?
-
Are lids / covers as per design and correct rating?
-
Has asset recording of all sewer lines been undertaken?
Sewer testing
-
Did all sewers pass pressure / vacuum testing and did the ovality ball pass all lines?
-
Are all sewer lines and access structures clean of debris and not holding water?
Water
-
Water
-
Water Contractor:
Water OH&S
-
Does the contractor have utilities / services plans on site?
-
Does plant and equipment have suitable warning lights and reversing beepers?
-
Are hats and vests being worn by workers where required?
-
Are trenches barricaded and made safe when left open?
-
Is lifting equipment suitable for the works being carried out?
Pre-Commencement
-
Does the water contractor have the latest revision construction issue drawings?
-
Is there an accredited pipe layer on site?
Trenching and Bedding
-
Are trench widths adequate for pipe size/ type
-
Is the bedding material & thickness within tolerance and being compacted correctly?
Pipe Laying
-
Are materials as specified, within acceptable manufacture date and stored correctly on site?
-
Are pipes being installed in accordance with design specification and manufacturers recommendations?
-
Are clearances to other services being maintained as per specification?
-
Are thrust restraints being installed as per design where required?
-
Is the installation of gas mains progressing without issues and clashes?
-
Are property services being installed as per design and specification for DW / NDW?
-
Are progressive cross connection-checks being carried out on DW and NDW?
Asset Recording
-
Has asset recording of all water mains, fittings and property services been undertaken?
-
Have any changes to the documented design been conveyed to asset recorders?
Backfilling
-
Does trench backll material comply with standard drawings and specications?
Surface fittings and Markings
-
Are lids / covers as per design and set correctly?
-
Have marker posts and pavement markings been installed to authority requirements?
-
Property Services:
-
Water Connection:
Water Mains Testing
-
Have all swabs been successfully passed?
-
Did all water mains successfully pass pressure testing?
Electrical and Communications
-
Electrical
-
Communications
Trenching, Service Installation and Backfilling
-
Are trench widths adequate for pipe size/ type?
-
Is the bedding material & thickness within tolerance and being compacted correctly?
-
Are cables / conduits / pits being installed in accordance with design spec and manufacturers recommendations?
-
Are clearances to other services being maintained as per specication?
-
Does trench backll material and compaction comply with standard drawings and specications?
-
Are lids / covers as per design and set correctly?