Title Page
-
Conducted on
-
Prepared by
-
Project
Water types checked
-
- Drinking Water
- Non-drinking Water
-
Add media
Site Management
-
Site Management
-
Registered Pipelayer
-
Onsite?
-
Add media
Occupational Health and Safety
-
Occupational Health and Safety
-
PPE as per site rules being worn.
-
Add media
Trench Excavation (MRWA-W-202)
-
Trench Excavation (MRWA-W-202)
-
Section checked ?
-
Depth of trench
-
Required minimum depth (TABLE 202-A: TRENCH DIMENSIONAL DETAILS)
-
Depth of trench
-
Width of trench
-
Required minimum width (TABLE 202-A: TRENCH DIMENSIONAL DETAILS)
-
Width of trench
-
Add media
Pipe Laying (MRWA-W-103)
-
Pipe Laying (MRWA-W-103)
-
Section checked ?
-
Pipe material
-
Pipe Dia.
-
Date of manufacture
-
Within last 12 months?
-
Pipe alignment as per drawings (DW and NDW on correct sides)
-
Witness marks sighted?
-
Witness mark distance from end of pipe (pipe to pipe connection) (MRWA-W-103 Table 2) _____________mm
-
Inserted witness mark distance from socket end. _________mm
-
Witness Mark Compliant?
-
Witness Mark Visible?
-
Witness Mark within 5mm?
-
Add media
Embedment and backfill (MRWA-W-201)
-
Embedment and backfill (MRWA-W-201)
-
Section checked ?
-
Embedment material
-
Compliant?
-
Embedment depth under pipe
-
Compliant?
-
Embedment cover over pipe
-
Compliant?
-
Area
- Trafficable Area
- Non-trafficable area
-
Clay backfill Compliant
-
CR backfill Compliant?
-
Add media
Pipe
-
Fittings
-
Welding
-
Clearances to other services (WSA03 Table5.2)
-
Property Connections
-
Add media
Thrust blocks (MRWA-W-205A and 205B)
-
Thrust blocks (MRWA-W-205A and 205B)
-
Section checked
-
Thrust blocks founded against undisturbed soil Compliant
-
Reinforcement installed and correct size Compliant
-
Thrust block sides have been formed using timber or sand bags Compliant
-
Add media