Title Page
-
Conducted on
-
Prepared by
-
Project
Site Management
-
Site Management
-
Registered pipelayer?
-
Registered pipelayer Onsite?
-
2. Drawings on site and current?
-
Add media
Occupational Health and Safety
-
Occupational Health and Safety
-
Appropriate PPE worn?
-
Appropriate trench safety measures in place?
-
Other?
-
Add media
Trench Excavation
-
Trench Excavation
-
Section checked ?
-
Trench width?
-
Within tolerance?
-
Add media
Pipe Laying
-
Pipe Laying
-
Section checked ?
-
Pipe centrally placed?
-
Pipe laser in use
-
Pipe material
-
Pipe diameter
-
Pipe class
-
Date of manufacture
-
Add media
Embedment
-
Embedment
-
Section checked
-
Embedment specified
-
Embedment Verified
-
Add media
Backfill
-
Backfill
-
Section checked
-
Backfill type
- CR Backfill
- Clay Backfill
- Other
-
Evidence of compaction
Manholes and Structures
-
Manholes and Structures
-
Structure(s) Checked
-
Rocker pipe free of concrete
-
Formwork in good condition
-
Mechanical vibration used