Title Page
-
Conducted on
-
Prepared by
-
Location
Hydrants
-
All Surrounds and covers in place (Surrounds undamaged, word "water" visible)
-
All cover levels flush with FSL (If no FSL, 2m topsoil surround required)
-
Chains attached to all lids
-
All heads 100-200mm below cover
-
All interiors cement stabilised
-
All hydrant marker posts in place as required (concrete footing required)
-
All blue RRPMs/Road Patches in place as required
-
Water ponding in hydrants eliminated
-
Hydrant supported to prevent rocking
. Valves
-
All surrounds and covers in place (words "water" and "valve" or ”SV” visible, marker discs as required)
-
All cover levels flush with FSL
-
All spindles 100-350mm below cover
-
Cover supported to prevent rocking
-
Kerb discs/Posts in place as required
Trenches
-
No subsidence evident in pavement and/or soil
-
Grass established
. Pavements
-
All pavements reinstated as required