Title Page
-
Conducted on
-
Prepared by
-
Site and Stage
General
-
Checked
-
PMP document on site
-
PPE on site in accordance with Contractors PMP
-
Impact on existing services
-
Current drawings and documentation on site
-
TMP in place
-
Services proved
Materials
-
Checked
-
Approved Water Company materials (dockets checked)
-
Pipe type and sizes as specified
-
Storage and manufacture date
Excavation
-
Checked
-
Trench width adequate (dia + 300mm min.)
-
Securing excavations or benching/battering
-
Ladder in the trench
-
Nature of ground
Boring
-
Checked
-
Bore shaft base
Sleeved
-
Cathodic protection (steel sleeve only if <10m)
-
Spacers/centralisers (1m max spacing)
-
Jointing
-
Annulus Grouted
Installation of Pipes
-
Checked
-
Inspection of components
Laying of pipes
-
Methods in place to verify grades, levels & offsets
-
Piped bedded & haunched
-
Jointing
-
De-beading (PE only)
Sewer Property Branches
-
Checked
-
Property branches to drawings
-
Cement stabilised material used
-
Sewer marker pegs & tape
Backfilling of Excavation
-
Checked
-
Selected materials from site (Max NS 75mm)
-
Backfill Type A under pavements and footpaths
Compaction methodology in place
-
MRWA WSA 02-2002-2.3
-
MRWA WSA 02-2002-2.3
Inspection Shafts, Maintenance Shafts and Maintenance Holes
-
Checked
-
In accordance with drawings
Concrete
-
Vibrator used
-
Concrete delivery docket checked
-
Manhole formwork in place minimum 24 hours after concrete poured
-
Step irons & ladders, top of ladders below the neck
Covers
-
flush with pavement/surrounding ground
-
sealed & greased
-
Class as specified
-
Landings/standing planks as specified
Drops
-
size
-
bracket spacing (max 1.5m)
-
Access chamber drop bend
-
Concrete surround in place
Liveworks
-
Checked
-
New works isolated
-
Access permits in place
-
Gas detector in place
-
Tripod, winch, harness
-
Three confined space accredited persons present
-
Breathing apparatus
Restoration
-
Temporary and permanent, pavement and grassed areas