Title Page

  • Conducted on

  • Prepared by

  • Location

Pre-testing Checklist

  • Has a testing request been lodged with the Authority?

  • Accepted Authority Ref:

  • Has the contractor carried out a pre-test?

  • Date of pre-test:

Live Works

  • Are any live works being carried out with testing? Eg. Insertion / removal of plugs?

  • Accepted Authority Ref (Eg Form Q14505)

  • Do you have a copy of the accepted form on site with you?

  • Have you confirmed with the contractor what works will be carried out today, as per the accepted form?

Equipment Check

  • Gauge Serial No. and Calibration date (Certificate Checked: )<br>Note: calibration date to be within 12 months of today’s date)

  • Gauge 1 S/N

  • Gauge 1 Cal. Date:

  • Gauge 2 S/N

  • Gauge 2 Cal. Date:

MH Testing Notes

  • Number of MHs to be tested: Note: Cast in situ 1 in 5 | Pre-cast All

MH Test Results

    Manhole Test 1
  • MH Number

  • Test Vacuum Pressure -35 kPa  -28 kPa (kPa)

  • Test Duration 3m  3m (minutes)

  • Pressure Loss < 5kPa allowable (kPa)

  • Test Result

  • Manhole Test 2
  • MH Number

  • Test Vacuum Pressure -35 kPa  -28 kPa (kPa)

  • Test Duration 3m  3m (minutes)

  • Pressure Loss < 5kPa allowable (kPa)

  • Test Result

  • Manhole Test 3
  • MH Number

  • Test Vacuum Pressure -35 kPa  -28 kPa (kPa)

  • Test Duration 3m  3m (minutes)

  • Pressure Loss < 5kPa allowable (kPa)

  • Test Result

  • Manhole Test 4
  • MH Number

  • Test Vacuum Pressure -35 kPa  -28 kPa (kPa)

  • Test Duration 3m  3m (minutes)

  • Pressure Loss < 5kPa allowable (kPa)

  • Test Result

  • Manhole Test 5
  • MH Number

  • Test Vacuum Pressure -35 kPa  -28 kPa (kPa)

  • Test Duration 3m  3m (minutes)

  • Pressure Loss < 5kPa allowable (kPa)

  • Test Result

  • Manhole Test 6
  • MH Number

  • Test Vacuum Pressure -35 kPa  -28 kPa (kPa)

  • Test Duration 3m  3m (minutes)

  • Pressure Loss < 5kPa allowable (kPa)

  • Test Result

  • Manhole Test 7
  • MH Number

  • Test Vacuum Pressure -35 kPa  -28 kPa (kPa)

  • Test Duration 3m  3m (minutes)

  • Pressure Loss < 5kPa allowable (kPa)

  • Test Result

  • Manhole Test 8
  • MH Number

  • Test Vacuum Pressure -35 kPa  -28 kPa (kPa)

  • Test Duration 3m  3m (minutes)

  • Pressure Loss < 5kPa allowable (kPa)

  • Test Result

  • Manhole Test 9
  • MH Number

  • Test Vacuum Pressure -35 kPa  -28 kPa (kPa)

  • Test Duration 3m  3m (minutes)

  • Pressure Loss < 5kPa allowable (kPa)

  • Test Result

  • Manhole Test 10
  • MH Number

  • Test Vacuum Pressure -35 kPa  -28 kPa (kPa)

  • Test Duration 3m  3m (minutes)

  • Pressure Loss < 5kPa allowable (kPa)

  • Test Result

Sewer Pipe Segment Tests

Sewer Pipe Segment Tests 1

Segment Details

  • From

  • To

  • Length

  • Diamater

Ovality Testing

  • Ovality Ball Diameter Checked

  • Ovality Ball Test

Pressure / Vacuum Testing

  • Test Type

  • Test Duration

  • Test Pressure

  • Pressure Loss

  • Test Result

Sewer Pipe Segment Tests 2

Segment Details

  • From

  • To

  • Length

  • Diamater

Ovality Testing

  • Ovality Ball Diameter Checked

  • Ovality Ball Test

Pressure / Vacuum Testing

  • Test Type

  • Test Duration

  • Test Pressure

  • Pressure Loss

  • Test Result

Sewer Pipe Segment Tests 3

Segment Details

  • From

  • To

  • Length

  • Diamater

Ovality Testing

  • Ovality Ball Diameter Checked

  • Ovality Ball Test

Pressure / Vacuum Testing

  • Test Type

  • Test Duration

  • Test Pressure

  • Pressure Loss

  • Test Result

Sewer Pipe Segment Tests 4

Segment Details

  • From

  • To

  • Length

  • Diamater

Ovality Testing

  • Ovality Ball Diameter Checked

  • Ovality Ball Test

Pressure / Vacuum Testing

  • Test Type

  • Test Duration

  • Test Pressure

  • Pressure Loss

  • Test Result

Sewer Pipe Segment Tests 5

Segment Details

  • From

  • To

  • Length

  • Diamater

Ovality Testing

  • Ovality Ball Diameter Checked

  • Ovality Ball Test

Pressure / Vacuum Testing

  • Test Type

  • Test Duration

  • Test Pressure

  • Pressure Loss

  • Test Result

Sewer Pipe Segment Tests 6

Segment Details

  • From

  • To

  • Length

  • Diamater

Ovality Testing

  • Ovality Ball Diameter Checked

  • Ovality Ball Test

Pressure / Vacuum Testing

  • Test Type

  • Test Duration

  • Test Pressure

  • Pressure Loss

  • Test Result

Sewer Pipe Segment Tests 7

Segment Details

  • From

  • To

  • Length

  • Diamater

Ovality Testing

  • Ovality Ball Diameter Checked

  • Ovality Ball Test

Pressure / Vacuum Testing

  • Test Type

  • Test Duration

  • Test Pressure

  • Pressure Loss

  • Test Result

Sewer Pipe Segment Tests 8

Segment Details

  • From

  • To

  • Length

  • Diamater

Ovality Testing

  • Ovality Ball Diameter Checked

  • Ovality Ball Test

Pressure / Vacuum Testing

  • Test Type

  • Test Duration

  • Test Pressure

  • Pressure Loss

  • Test Result

Sewer Pipe Segment Tests 9

Segment Details

  • From

  • To

  • Length

  • Diamater

Ovality Testing

  • Ovality Ball Diameter Checked

  • Ovality Ball Test

Pressure / Vacuum Testing

  • Test Type

  • Test Duration

  • Test Pressure

  • Pressure Loss

  • Test Result

Sewer Pipe Segment Tests 10

Segment Details

  • From

  • To

  • Length

  • Diamater

Ovality Testing

  • Ovality Ball Diameter Checked

  • Ovality Ball Test

Pressure / Vacuum Testing

  • Test Type

  • Test Duration

  • Test Pressure

  • Pressure Loss

  • Test Result

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.