Information
-
Site IPM
-
Conducted on
-
Prepared by
-
Location
Land owner information
-
Has you spoken to land owner
-
Has a scheduled date been discussed ?
-
Does the landowner require a follow up phone call ?
-
Name ( preferred contact )
-
Phone ( preferred contact No )
-
Any special requirements
-
Comments
-
Add media
1.0 - Access Track
-
1.1 - Is there an existing track ?
-
1.2 - Does the site need access across paddock ?
-
1.3 - Has environmental approval been sorted ?
-
1.4 - Have photos been taken of the access ?
-
Add media
2.0 - Access to site
-
2.1 - Is the site near and roads ?
-
2.2 - Has a traffic plan been designed for this site ?
-
2.3 - Will traffic control be required to unload / load plant ?
-
2.4 - Will traffic control be required for delivery of materials (clay) ?
-
Notes
Draw map to access of meter
-
Site
3.0 - Fencing
-
3.1 - Is there an existing gate for this site ?
-
3.2 - Does the fence require cutting for construction ?
-
3.3 - Is the fencing on the farmers property damaged ? ( Take photos )
-
3.4 - Does the site require stock - proof fencing around the pedestal ?
4.0 - Services
-
4.1 - Are there any overhead assets on site ?
-
4.2 - Are there any underground assets on site ( Telstra, S & D pipes etc. ) ?
-
4.3 - Does the site require electrical spotters for unload / Loading of plant ?
-
4.4 - Does site require electrical spotters for the works
-
Notes ( list services, other comments )
5.0 - Shading
-
5.1 - Is there potential for shading of the pedestal ?
-
5.2 - Will tree removal be required ?
-
5.3 - Will a remote mast be required ?
-
Notes
6.0 - Temporary Bench Mark ( TBM )
-
6.1 - Will a surveyor be required to install a new TBM ?<br>
-
Notes ( distance to closes TBM )
PHOTOS
-
Add media
-
Add media
-
Add media
-
Add media
Sign Off
-
Signature of person doing inspection