Information

  • Document No.

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Time of arrival

  • Time of departure

  • Travel Time

Panel Checks

  • Is the system Monitored

  • Type of Signalling equipment

  • The following checks on the intruder/hold-up alarm installation have been completed in accordance with BS 9263 2016.

  • Installation meets the ‘as fitted’ document

  • Tamper detection<br>NOTE Check at least one tamper for correct operation through to the CIE.<br>

  • Setting and unsetting<br>NOTE Offer user(s) refresher system operation training, if required.<br>

  • Entry and exit procedures

  • Power supplies, including any APS.<br>(Testing of batteries and current readings)<br>

  • Quiescent Current _________________mA

  • Alarm Current _________________mA

  • Battery Calculations to verify suitability. Q x 11.5 + A x 0.5 = _________ x 1.25 = _________ C Min

  • Battery Fitted ________ah - Suitable YES/NO

  • What size Battery is installed ?

  • Functioning of detectors and HD’s<br>(Full Walk test of system, Test PA buttons in normal Day Mode)<br>

  • Environmental conditions for adverse effects<br>(Check all detection is not damaged by water ingress or blocked)<br>

  • What Adverse effects are present

  • Operation of warning devices<br>(including removal of the hold off voltage to the external sounder, this should operate the unit until the hold off supply is restored)<br>

  • Operation any ATS <br>(NOTE all paths must be tested)<br>

  • What could not be tested and why ?

  • Visual inspection for potential problems <br>(electrical and physical)<br>

  • What Is the problem ?

  • Care should be taken to ensure the equipment is properly reinstated after testing.

  • Engineer Comments

  • Additional Work Required

  • What additional work is required ?

Parts required for repair

  • Are replacement parts required

  • What parts are required to repair fault

  • Have replacement Parts been installed

  • What Parts have been used

Customer Acceptance

  • Customer name :

  • Customer Signature

Job completion

  • I hereby certify that the works described above have been carried out and have been completed to my satisfaction. I agree that any outstanding works have been explained and I agree to arrange for any outstanding or further works described under the "Further action required by client" section above to be carried out. I also undertake to ensure payment of any applicable charges. Current standard charges plus any parts costs.

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.