Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Work Order Number
Untitled Page
(T)ools, (S)afety Equipment and (M)aterials
-
Mechanic's tool set. Refrigeration tools
-
Rags and cleaning materials
-
Refrigerant leak tester
-
Replacement lamps
-
Ladder
-
Personal protective equipment (PPE) for handling refrigerants
-
Rags
Safety Guidelines
-
Schedule work with operating personnel
-
Follow site safety rules for lockout and tagout
-
Be very careful when climbing roof access ladders
-
Review and follow the manufacturer’s instructions
-
Follow safety and environmental rules for refrigerants
-
Don't vent refrigerants. Refrigerants must be recovered
-
Submit a work order if refrigerants need to be added
-
Report any problems you find
-
Record the results in the maintenance log
Maintenance Procedures -Equip ID # 734 Chiller-
-
Review the Airstack Chiller daily log sheet. Perform trending and assess any needed corrective action
-
Visually check power connections
-
Visually check control power connections
-
Perform a visual check for oil or leaks
-
Check system refrigerant sight glass for leaks or moisture
-
Manually switch hydronic pumps from 1 to 2 or from 2 to 1
-
Switch lead or lag switch on pumps
-
Perform a visual check for system water leaks
Maintenance Hours
-
Estimated time spent on Work order
Maintenance Procedures -Equip ID # 488 (Module 1)-
-
Review the Airstack chiller daily log sheet. Perform trending and assess any needed corrective action
-
Visually check power connections
-
Visually check control power connections
-
Perform a visual check for oil or leaks
-
Check system refrigerant sight glass for leaks or moisture
-
Manually switch hydronic pumps from 1 to 2 or from 2 to 1
-
Switch lead or lag switch on pumps
-
Perform a visual check for system water leaks
Maintenance Hours
-
Estimated time spent on work order