Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
code: BOCOND31WK
Safety Guidelines
-
Schedule work with operating personnel
-
Check with operating personnel for deficiencies
-
Follow site safety rules and your supervisor's instructions
-
Obtain and review manufacturer's instructions
-
Report any problems you find
-
Record the results in the equipment history log
Maintenance Procedures
-
Visually inspect the igniter. Check the flame signal strength
-
Clean the flame inspection window
-
Verify that there are no gas or fuel leakages
Maintenance Hours
-
Time spent on work order?
code: BOCOND30WK
Safety guidelines
-
Schedule work with operating personnel
-
Check with operating personnel for deficiencies
-
Follow site safety rules and your supervisor's instructions
-
Obtain and review manufacturer's instructions
-
Report any problems you find
-
Record the results in the equipment history log
Maintenance Procedures
-
Procedure for check boiler operation:
-
Complete an overall visual inspection to be sure all equipment is operating and that safety systems are in place.
-
Burner and flame:
-
Observe the conditions of the main flame. A normal high fire flame shows an orange screen with a blue halo. In low fire the burner should display a reddish orange glow.
-
Mechanical (Water side):
-
a: Verify that there is no leakage from the relief valves.
-
b: Inspect the system for water leaks or damaged insulation.
-
c: Check all linkages for proper setting and tightness.
-
Venting system:
-
a: Inspect the boiler for air leaks. Check the damper seals.
-
b: Check for correct air adjustment. Analyze the flue gas consumption if necessary.
-
Cleanup:
-
Confirm that the boiler area is free of combustible materials and that there is nothing obstructing air openings.
maintenance Hours
-
Time spent on work order?