Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

  • Work Order Number

Untitled Page

(T)ools, (S)afety Equipment and (M)aterials

  • Controls tool set

  • Vacuum cleaner

  • Spray air

Safety Guidelines

  • Schedule outage with operating personnel

  • Perform applicable lockout/tagout steps of site safety procedures

  • Record and report equipment damage or deficiencies

  • Review and follow the manufacturer OM instructions

  • Record results in the equipment history log

Maintenance Procedures

  • Clean and inspect all hardware

  • Clean exterior and inspect for damage

  • Clean interior panel components of dust and foreign material

  • Run system operations and maintenance checks (scan disk/defrag) and any other vendor recommended procedures

  • Inspect electrical wiring for damage and loose connections

  • Remove tags and energize circuit

  • Verify unit boots automatically and all control functions are restored

  • Verify proper operation of the UPS unit and any other peripherals

  • Operational Test panel/electronic control units

  • Verify that all alarm, control, and communication circuits operate correctly

Maintenance Hours

  • Time spent on work order?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.