Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Work Order Number
Untitled Page
(T)ools, (S)afety Equipment and (M)aterials
-
Controls tool set
-
Vacuum cleaner
-
Spray air
Safety Guidelines
-
Schedule outage with operating personnel
-
Perform applicable lockout/tagout steps of site safety procedures
-
Record and report equipment damage or deficiencies
-
Review and follow the manufacturer OM instructions
-
Record results in the equipment history log
Maintenance Procedures
-
Clean and inspect all hardware
-
Clean exterior and inspect for damage
-
Clean interior panel components of dust and foreign material
-
Run system operations and maintenance checks (scan disk/defrag) and any other vendor recommended procedures
-
Inspect electrical wiring for damage and loose connections
-
Remove tags and energize circuit
-
Verify unit boots automatically and all control functions are restored
-
Verify proper operation of the UPS unit and any other peripherals
-
Operational Test panel/electronic control units
-
Verify that all alarm, control, and communication circuits operate correctly
Maintenance Hours
-
Time spent on work order?