Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

  • Work Order Number

Untitled Page

(T)ools, (S)afety Equipment and (M)aterials

  • Electrician's tool set

  • Multimeter

  • Canned air

Safety Guidelines

  • Schedule the work with the users

  • Follow the site safety procedures

  • Follow the manufacturer's instructions

  • Report any problems you find

  • Record the results in the equipment maintenance log

Maintenance Procedures

  • Clean the ventilation ports

  • Blow out the interior with canned air

  • Check the electrical connections and make sure they are tight

  • Record the charger output voltage and current

Maintenance Hours

  • Estimated time spent on work order?

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.