Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Work Order Number
Untitled Page
(T)ools, (S)afety Equipment and (M)aterials
-
Mechanic's tool set
-
Hose and bucket
-
Gaskets or gasket material
Safety Guidelines
-
Schedule shutdown with operating personnel
-
Check with operating personnel for deficiencies
-
Follow site safety rules and your supervisor's instructions
-
Lock and tag inlet and outlet valves
-
Obtain and review manufacturer's instructions for corrosion protection
-
Report any problems you find
-
Record the results in the equipment history log
Maintenance Procedures
-
FOR STRAINER:
-
Remove flange cover bolts
-
Remove cover plate
-
Remove device or devices; clean and inspect for damage
-
Clean strainer housing cover plate and any interior apparatus. Check for cracks and deterioration
-
Install cover and reassemble
-
Unlock the valves, and remove the tags
-
Open the valves, and check for leaks
Maintenance Hours
-
How much time was spent on this work order?