Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Work Order Number
Untitled Page
Safety Guidelines
-
Perform proper lockout/tagout steps
-
Schedule outage with operating staff
-
Follow site safety rules and your supervisor's instructions
-
Record and report equipment damage or problems
-
Note and list all test results in the pump maintenance log
-
Obtain and review manufacturer's operation and maintenance instructions
Maintenance Procedures
-
Check the pump for excessive vibration, leakage or other abnormal operation
-
Record the inlet and outlet pressures
-
Note any pending problems which should be fixed before the annual maintenance check
Maintenance Hours
-
Time spent on work order?