Title Page
-
Site conducted
-
Inspection Title
-
Inspection date & time
-
Prepared by
-
Location
-
Clients PM
-
Principal Contractor
-
Site Manager
Grenfell Safety Inspection
Project H&S Organisation
-
Project Arrangements
-
Project Risk Register
-
Construction Phase Plan
-
Fire Risk Assessment
-
Inductions
-
Permits to Work
-
Communications/Consultation
-
Information
-
F10
-
Liability Insurance
-
HSE Law Poster
-
Corrective Actions closed out from last Audit
COVID-19 Operating Procedures & Site Controls
-
Site Access/Egress suitable (Signage, Space, Floor markings, etc)
-
Good communication
-
Canteen and Rest Areas maintaining Social Distancing Controls
-
Work Planning to Avoid Close Working (ie. rotation of workers and how this rotation is being managed).
-
Housekeeping and Cleaning being maintained in the Welfare area
Site Establishment
-
Welfare
-
Canteen
-
Drying/Changing Room
-
First Aid
-
Washing Facilities
-
Walkways/safe routes
-
Fire escape routes
-
Access and Egress on site
-
Offices
-
Storage
-
CoSHH
-
Hoarding
-
Security
-
Signage
-
Traffic Management
-
Vehicle/Pedestrian Segregation
Emergency Arrangements
-
Fire Fighting Equipment
-
Fire Signage
-
Fire Escape route
-
Fire Assembly
Safety Management
-
Risk Assessment
-
Method Statement
-
Scaffold/Register
-
Temporary Works Register
-
Plant Certification
-
PUWER Register
-
LOLER Register
-
Hoist register
-
Tool box talks
-
Safe Starts
Safe Working
-
Housekeeping
-
Tools & Equipment suitable for the task
-
Manual handling
-
Signage
-
Barriers, Fencing & Signage
-
Compliance with method statement
-
Personnel Protective Equipment PPE
-
Lighting
-
Work at Height
-
Mobile Elevated Working Platforms (MEWP)
-
Confined Space
-
Edge Protection
-
Asbestos
-
HV Electrical installation
-
Prop checks
-
Noise
-
Dust
-
Vibration
-
Environmental
Additional Observations
-
Media
-
Comments
Authorisation
-
Auditor Sign off
-
Site Manager Sign off