Title Page
-
Site conducted
-
Conducted on
-
Name of auditee
-
Location
-
Name of Auditor
Process Audit Report
Audit Sheet
-
POSHS METAL INDUSTRIES PVT. LTD
-
Doc. No.: PMIPL/02/MR/CD/F/10/00
-
Date: 15/01/2019
-
Page No: of 4
-
PROCESS AUDIT FORM
-
Name of the Process
-
Date of Audit
-
Process Owner
-
Auditor
-
Process Associates
-
Component/ Size
-
Shift Covered
-
Customer
-
Sr No
Parameter
-
Score
-
Comments/ Observation/ Evidence
-
Action Plan
-
Action to be taken
-
Resp
-
Date
-
Status
HOUSEKEEPING
-
a) Is it neat, clean, orderly?
-
b) Scrap regularly removed From line ?Is the scrap cycle defined
-
c) Item without identification type & acceptance status
-
d) Is there specific place for OK, rework, reject, scrap
-
e) Good & Bad mixup possibility?
-
INFRASTRUCTURE
-
a) Lighting
-
b) Ventilation
-
c) Tool Availibility and accessibility
-
d) Floor condition
-
e) Safety Arrangements
-
f) Fire safety
-
SAFETY
-
a) Is there a display of list of ppes
-
b) Are Safety instructions displayed & followed?
-
c) Is the work station designed to take care of safety of the operators and products?
-
d) Are emergency switches/ First Aid easily accesible?
-
VISUAL CONTROL Parameters to judge efficiency of the process
-
a) Have they been identified?
-
b) Has the database/TARGETS specified for each?
-
c) Have the parameters been displayed each one?
-
d) Does every employee understand & realize his/ her actions to improve performance
-
e) Is display up to date?
-
f) Is any parameter missing/ needs to be added?
-
MONITORING & MEASURING DEVICES
-
a) No of online instruments that are working
-
b) No of online instruments that are not working
-
c) Is everyone with its unique identification?
-
d) Is everyone with its calOK identification?
-
e) Date due for calibration Known? ComplIed?
-
WI/ PFD/ FMEA/ CONTROL PLAN
-
a) Is the station having all documents like Work Instructions, Process Flow, FMEA, Control Plan? Are these displayed?
-
b) Does everyone understand and interpret these documents?
-
PROCESS PARAMETERS
-
a) How many parameters are there?
-
b) How many are measured, monitored and acted upon Online Offline
-
c) How many are not subjected to control
-
d) What action plan on point c?
-
PRODUCT PARAMETERS
-
a) How many parameters are there?
-
b) How many are measured, monitored and acted upon Online Offline
-
c) How many are not subjected to control
-
d) What action plan on point c?
-
e) Are Special characteristics highlighted for better understanding & monitoring of critical parameters?
-
RECORDS
-
a) Are the relevant details in production and inspection reports complete and maintained?
-
b) Are these records easily retrievable?
-
PROCESS DEFECT PREVENTION
-
a) What are the process defects occurring? Is list available?
-
b) Which ones are detected at the process? How? Does it detect 100%? How effective is the detection?
-
c) Which ones affect customers Internal and external defects Seriousness of each defect
-
d) Measures to prevent the above defects Mistake proofing possible at the process? Fool proofing inspection and testing for efficient detection?
-
AUTONOMOUS MAINTENANCE
-
a) Is AM checklist available & updated? Does it include all the points?
-
b) Does everyone understand and interpret its importance?
-
c) Are the following under display Rules and precautions for start and stop Lubrication points Check ups before start and closure
-
TRAINING
-
a) Has need assesment made for each employee
-
b) Records of needs met/ not met?
-
c) Plan to meet (check in hrd)
-
STATUS OF CAPA
-
a) Awareness of customer complaints/ issues?
-
b) Are the causes of Non Conformance analysed and Corrective actions verified for their Effectiveness?
-
MAINTENANCE
-
a) Is there any preventive maintenance schedule?
-
b) Is it followed?
-
c) Is there evidence of updating it to utilize the latest experience/ knowledge?
-
d) Is there any plan to upgrade the machine to improve its capability?
-
HANDLING & PACKAGING
-
Is The Job Secured During Its Handling ? Are handling instructions available?
-
Is packaging done as per customer requirement/specified WI?
-
Is FG loading & Unloading as per Specified WI?
-
AWARNESS
-
Is The CSR available ?
-
Is Role & Responsibility defined for personnel & Personnel aware about it?
-
Is the quality Policy available & personnel aware about it?
-
Are the relevant person(s) aware about measurement techniques
-
Are the personnel aware about risks to customer from non conforming product
-
Are personnel aware about overall process operations
-
GENERAL
-
Is the shift handover details available & personnel aware about it?
-
Are the errorproofing devices in working condition & devices tested for failure?
-
Is the incoming inspection done as per Acceptance criteria ?
OTHER SUGGESTIONS FOR IMPROVEMENT
-
1 indicates existing in practice /basic /irregular (2) Exists with objective Evidence/documents but is implemented partially (3) Exists with compliance to established norms and is a sustained practice
Auditor Sign & Designation
-
Auditee Sign & Designation
Other Observation
-
POSHS METAL INDUSTRIES PVT. LTD
-
Doc. No.: PMIPL/02/MR/CD/F/10/00
-
Date: 15/01/2019
-
OTHER OBSERVATION / OPPORTUNITY FOR IMPROVEMENTS
-
Auditee sign & date
-
Auditor sign & date