Title Page
-
Internal Audit Number
-
Site conducted
-
Conducted on
-
Performance Model Process(es)
-
Matrix Process(es)
-
Process Owner(s)
-
Internal Audit Manager Name
7. Planning (Stage 1: Initiating the Audit)
-
7.2.2 Internal Auditor(s) assigned by Internal Audit Manager:
-
7.2.3 Internal Audit Manager recruit any Technical Specialist(s)?
-
Technical Specialist(s) names:
-
7.2.5 Physical area(s) to be audited:
-
10.0 Confirmed Auditor(s) qualifications, if Under Instruction/Evaluation enter names here:
-
Proposed Audit Start Date
-
Proposed Audit Duration:
-
7.2.6 Process Owner and SME accept audit dates?
-
Revised Audit Start Date:
-
SME name:
-
Projected Audit Completion Date
-
7.2.7 SME(s) designated by Process Owner(s)
-
7.2.8 Draft Audit Inspection Report shared with Process Owner(s) and SME(s)
-
7.2.9 Audit Plan (shared blank inspection report with any LOI entered in 8.1) approved by Process Owner(s)?
-
Date Approved
8. Conducting
8.1 and 8.2 Preparing for the audit activities (e.g., desktop audit), conducting the audit Activities (e.g., interviews, observations)
-
Line of inquiry
-
LOI:
-
Interviewee(s):
-
Scheduled/revised interview date and time held:
-
LOI Determination:
8.2.1 Findings:
-
Related LOI Number(s):
-
Cited Clause(s):
-
Requirement statement:
-
Finding statement:
-
Type:
-
Classification
-
CAPA Event Number(s):
-
Can financial impact be determined?
-
What is the financial impact? (to be aligned with Finance guidance if desired at all).
-
Was the issue corrected on the spot (i.e. during the audit)?
-
What action was taken to correct? Reference applicable corrective action tracking numbers.
-
CAPA Event Number(s):
-
8.2.2 Inspection Report version for use in the Audit Report shared with Process Owner(s)
-
8.2.4 Meeting held with Process Owner(s) to present findings.
Closure
8.3 Reporting / 8.4 Completing / 8.5 Follow-up:
-
Impacted Process Owners (including those possibly affected by any NCR/CAR):
-
8.3 Submit AUDIT REPORT: attach WORD version of Inspection Report to DCRM System Document Change Request (DCR) and enter DCR hyperlink here:
-
8.4 Internal Audit Manager review and confirm completed within (3) days after Internal Auditor meeting with Process Owner(s) in 8.2.4.
-
8.5.1 Process Owner(s) acknowledgment: (Include any actions assigned by the Process Owners for gaining resolution here)
-
8.5.2 Initial Responses from Process Owner(s) on any NCN were completed within (10) days as recorded in the DCRM System?
-
Response Date (most recent)
-
Timely response (within 10 days)
-
8.5.3 Audit Reporting noncompliance CAPA Event Number:
-
8.5.5 Audit Closure Date:
9. Remote Audit: Internal Audit Manager notifications to Facility Operations Manager
-
9.2 Participant(s) contact information:
-
9.2 Types and identification of mobile devices utilized:
-
9.2 Schedule and location of spaces to be visited at each site:
11. Records (filed with evidence attached or archived for retention in Records Management):
-
Internal Audit Report Primary Document Number in DCRM System and hyperlink entered here:
-
Non-Conformance Report (NCR) or Corrective Action Report (CAR) Primary Document Number in DCRM System and hyperlink entered here: