Information
-
Document No.
-
Conducted on
-
Conducted by:
-
Location
A. Material Identification / Nonconforming Material
-
Are all racks and containers labeled?
-
Are all parts in the correct location?
-
Are all rejected parts, suspect parts and parts waiting for rework segregated in a nonconforming area or container?
B. Compliance to ODS & Quality Alerts
-
Is the work instruction in a good location for easy viewing? <br><br>
-
Are the operating steps / standardized work followed?
-
Are operators certified for the stations they are working at?
-
If a Quality Alert is posted, is it current? Clearly visible to the operator? Training recorded and followed?
C. Process / Product Monitoring
-
Were First Changeover parts approved, with parts tagged and stored?
-
Are the quality checks defined on the work instruction performed as required?
-
Were SPC or Go-No Go checks completed and recorded according to instructions?
D. Poka Yoke / Job Setup
-
Were job setups completed as required?
-
Were poka yoke verifications completed according to the instructions?
-
Are poka yoke bypass / reset requirements followed?
E. Calibration
-
Are all required gages, fixtures, etc available on the line, up-to-date for calibration, and in good condition?