Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
SAMPLE AREAS
PRODUCTION CONTROL
-
Management of the Aircraft Log. Ensure through random samples that defects are transferred correctly and log entries comply with the applicable guidance information. (Paper or Electronic). Detail log entries sampled.
-
Review Doc Log controls. Ensure through random selection all documents are controlled and accounted for.
-
Has a CRS been nominated for the aircraft in work?
-
Are the CRS signatory and deputys' names displayed as required?
-
Ensure through sampling that defect card information is accurately transferred to the SAP system. Quote task card/s sampled.
TASK ASSESSMENT 1
-
Unrecorded work - Are cards available and in use for subject task. Detail Orders/Task sampled.
-
Use of Approved data - Is the relevant maintenance instruction available and in use?
-
Competence permit current? - Can the colleague being sampled demonstrate he/she has a current Generic competence permit and an annual Competence skill based assessment (S1/2/3)
-
Suitable skills attained for accomplishing task? e.g. S1/S2/S3, Relevant Training and/or experience?
-
Control of tooling and spares - Are tools and spares used and stored appropriately?
TASK ASSESSMENT 2
-
Unrecorded work - Are cards available and in use for subject task. Detail Orders/Task sampled.
-
Use of Approved data - Is the relevant maintenance instruction available and in use?
-
Competence permit current? - Can the colleague being sampled demonstrate he/she has a current Generic competence permit and an annual Competence skill based assessment (S1/2/3)
-
Suitable skills attained for accomplishing task? e.g. S1/S2/S3, Relevant Training and/or experience?
-
Control of tooling - Are tools and spares used and stored appropriately?
CERTIFICATION
-
Review an Independent (Duplicate) Inspection requirement for correct completion and recording. Check awareness of requirements (GEN 10, GEN 35, GEN 52 etc including compliance with time-frame parameters) and ensure inspections have been accurately recorded and certified accordingly. Record findings.
-
Check three task cards for correct certification. Record Order numbers sampled. Are the cards certified correctly and iaw the delegation level recorded i.e. BAMO
-
Check three task cards for HUB 1 in current in work revision to ensure correct certification of inspection tasks within task card. Please pay particular attention to task cards with inspections for components or connectors within the task. Ensure these tasks are correctly certified by ‘Certifying engineers only’. BAMC Inspection criteria states - “As part of each ‘Inspection’ the certifying Engineer shall make a decision regarding the condition of the component, system or area inspected by reference to approved maintenance data”. If any task cards are found with inspections completed by anyone but certifying engineers, these tasks must be re-accomplished by a certifying engineer. All sampled task cards to be recorded. (This audit sample check is as a result of findings relating to inspections which have been found completed by a Mech/Tech and over-signed by an Engineer, which is in breach of certification standards at BAMC)
-
Check three task cards for HUB 2 in current in work revision to ensure correct certification of inspection tasks within task card. Please pay particular attention to task cards with inspections for components or connectors within the task. Ensure these tasks are correctly certified by ‘Certifying engineers only’. BAMC Inspection criteria states - “As part of each ‘Inspection’ the certifying Engineer shall make a decision regarding the condition of the component, system or area inspected by reference to approved maintenance data”. If any task cards are found with inspections completed by anyone but certifying engineers, these tasks must be re-accomplished by a certifying engineer. All sampled task cards to be recorded. (This audit sample check is as a result of findings relating to inspections which have been found completed by a Mech/Tech and over-signed by an Engineer, which is in breach of certification standards at BAMC)
-
Check three task cards for HUB 3 in current in work revision to ensure correct certification of inspection tasks within task card. Please pay particular attention to task cards with inspections for components or connectors within the task. Ensure these tasks are correctly certified by ‘Certifying engineers only’. BAMC Inspection criteria states - “As part of each ‘Inspection’ the certifying Engineer shall make a decision regarding the condition of the component, system or area inspected by reference to approved maintenance data”. If any task cards are found with inspections completed by anyone but certifying engineers, these tasks must be re-accomplished by a certifying engineer. All sampled task cards to be recorded. (This audit sample check is as a result of findings relating to inspections which have been found completed by a Mech/Tech and over-signed by an Engineer, which is in breach of certification standards at BAMC)
SAFETY BEHAVIOURS
-
Have suitable safety precautions been taken applicable to the task? Consider as a minimum the following: Use of PPE/Safety Barriers in place/Use of cautions and warnings/Adequate safety men if applicable/Working at height controls...This list isn't exhaustive!
-
Sample check colleagues to ensure security passes are worn and displayed correctly.
EFFECTIVE COMMUNICATION
-
Check three individuals for read & sign compliance. Record staff numbers sampled.
HANGAR ENVIRONMENT
TOOL CONTROL
-
Are control methods being adhered to for zonal/work area tool kits? Sample and record two areas.
-
Sample 5 colleagues use and/or control of company issued or personal torches. Check that appropriate tool control is being adhered to. Consider tagging, etching etc as applicable . Record staff numbers of colleagues checked.
BLANKING/CB GAG CONTROLS - Check all blanking boards for compliance with documented control process.
-
Circuit Breaker Gags
-
Hydraulic Blanks
-
Pitot/Static Blanks
-
Oxygen Blanks
-
Correct use of rig/safety pins
Control of consumables
-
Are consumable items being stored appropriately. Consider manufacturers guidance and ensure oils/fluids etc are secured, bunded, and controlled as required.
SUMMARY
-
Add commentary to summarise overall impression of area sampled. Identify areas for improvement as applicable to the recorded sample checks.