Title Page
-
Conducted on
-
Prepared by
-
Location
Arrangements for managing Health and Safety.
-
Is there evidence that the project and site team are aware of their H&S responsibilities?
-
Is there evidence that the project H&S goals are clear and achieveable?
-
Is there evidence that the project team are monitoring and reviewing the H&S performance?
- Compliant
- Non-Compliant
- N/A
-
Planned audits?
- Yes
- No
- N/A
-
Adhoc audits?
- Yes
- No
- N/A
-
Site Safety inspections?
- Yes
- No
- N/A
-
Weekly meetings ( including H&S)?
Co-operation between Project Team and Contractors.
-
Is there evidence of a project pre-start meeting?
-
Is there evidence of project co-ordination/ progress meetings?
-
Is there evidence of lessons learnt meetings?
Consultation with workforce.
-
Is there evidence of how consultation with the workforce is being managed and does it include?
- Yes
- No
- N/A
-
The display of any Statutory notices.
- Yes
- No
- N/A
-
How the relevant H&S information will be communicated between the PC and other contractors.
-
What arrangements will be in place to ensure contractors and others are encouraged to discuss and communicate with each other on H&S issues?
-
Is there evidence of Toolbox talks being carried out?
-
Are the toolbox talks based on recent non-compliance issues, incidents, follow up actions?
-
Are TBT's carried out regularly and in a structured manner based on H&S performance of Key issues?
-
Are TBT's carried out following any findings from a H&S inspection or audit?
Management of change and document control.
-
Is there evidence of how the project team are managing the flow of information when changes are made to site documentation and procedures?
-
With respect to H&S?
- Yes
- No
- N/A
-
Liaison between all parties?
- Yes
- No
- N/A
-
Exchange of information?
-
Recording of information?
Contractor selection and Control.
-
Is there evidence of how Contractors and sub contractors have been selected and managed?
- Yes
- No
- N/A
-
How there competence and resources have been assessed?
-
Is there evidence that contractor RAMS are being received and reviewed?
-
Is there evidence that RAMS are being checked for adequacy and adherence on site?
Site Inductions.
-
Is the site induction suitable for the project?
- Yes
- No
- N/A
-
Does the induction include emergency arrangements and evacuation procedures?
- Yes
- No
- N/A
-
Identification of first aid personnel and location of first aid equipment?
- Yes
- No
- N/A
-
Types and location of fire fighting appliances?
- Yes
- No
- N/A
-
Accident or incident reporting procedures/
- Yes
- No
- N/A
-
Welfare facilities, location and contents?
- Yes
- No
- N/A
-
Site H&S duties and responsibilities?
- Yes
- No
- N/A
-
Individual legal duties?
- Yes
- No
- N/A
-
Site specific hazards?
Training and competence.
-
Is there evidence that a site training register is available and being maintained?
Welfare.
-
Is there evidence that the project has considered Occ health and Welfare commitments?
-
Has it considered harmful agents(COSHH)?
-
Manual handling?
-
Psychosocial factors (stress/ bullying/violence)?
-
Are toilet facilities suitable for the size and gender of the workforce?
-
Are there suitable and sufficient washing facilities for the size and gender of the workforce?
-
Are there suitable and sufficient changing rooms for the size and gender of the workforce?
-
Is there mess rooms/ canteens?
-
Is there evidence that housekeeping is being maintained?
-
Is there evidence that waste is being managed as per UKBU requirements?
-
Are access and egress routes being maintained and adhered to?
First aid provision
-
How many first aiders are provided on site?
-
What first aid provisions are provided?
-
Location of first aid equipment?
-
Location of first aid room identified on site plans?
-
Location of nearest A&E department identified on site plans?
Fire and Emergency procedures.
-
Is there a specific project fire and emergency plan?
-
Has it been communicated and available for all site personnel?
-
Is evidence of any Emergency drills being carried out?
Arrangements for controlling significant risks.
-
Have all significant risk been identified and details of how these risk will be controlled been documented?
- Yes
- No
- N/A
-
Confined space.
-
Temporary Openings
-
Site Vehicles and Traffic.
-
Scaffold and working platforms.
-
Lifting equipment and lifting operations.
-
Working at height.
-
COSHH.
-
Asbestos.
Is there a Permit to Work system to control;
-
Hot works.
-
Confined Space
-
Electrical work
-
Excavation work
Temporary Works.
-
Has a Temporary works co-ordinator been employed and identified in writing?
-
Have Temporary works Supervisors been employed and notified in writing.
-
Is there a Temporary Works register in place?
-
Do Temporary works comply with the requirements of BS5975-2019?
Environmental awareness.
-
Is there evidence of arrangements if required to meet the duties of current environmental legislation?
-
Prevention of dust emissions?
-
Management of spills?
-
Management of noise?
-
Waste management?