Title Page

  • Site Conducted

  • Conducted on

  • Prepared by

  • Contracts Manager

  • Project Manager

  • Site Manager

  • Work in Progress

  • Scope/element of works being inspected

  • Contractor Contracts Manager/Supervisor responsible.

  • Contractor Undertaking the works

  • Drawing/Design Reference/Specification No:

  • Has the works been completed to the required specification, including the correct materials being used

  • Has the works been completed as per the specific drawing, as stated under Drawing/Design Reference No:

  • Is the work complete to the required standards, including quality, finish

  • Are the works suitable to be signed off

  • Comments and feedback

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.