Title Page
-
Site conducted
-
Site Project Manager
-
Contracts Manager
-
Conducted on
-
Prepared by
-
Location
-
undefined
Site Entrance/Access
-
The access was clean, safe and tidy
-
There was clear directional Signage
-
The gates were secured or being managed at all times
-
There is a defined pedestrian access point
-
The pedestrian access route was safe, well lit and has directional signage to the welfare
-
Parking was available for Contractors and Visitors
-
Parking directional signs were in place for Operatives/Visitors
Site Cleanliness and Housekeeping
-
The site looked generally clean and tidy
-
All waste was being managed correctly
-
Waste was secured to prevent migration i.e. secured skips/bins
-
Waste was being separated as required
-
All contractors were managing/removing their waste on a daily basis
-
The offices and Site Welfare (including contractors welfare) were being maintained in a clean and tidy manner
-
No materials, tools or equipment were being stored in any welfare or site offices/meeting rooms
On and Off Site Safety
-
Pedestrian routes were in place to and from the welfare/work area
-
Ground conditions were clean, compact and safe
-
All materials were stored in a safe and secure manner
-
All operatives were wearing A.& H. logoed PPE
-
All operatives were wearing the correct PPE for the task
-
No Radios were being used
-
Mobiles Phones were not being used in the work area
-
Plant operating areas were segregated by the contractors
-
Work at Height areas are being segregated by the contractors
-
Any equipment inspected was in good order
-
Site Safety Lighting was available and suitable for the site conditions
-
Areas where falls could occur were segregated sufficiently with suitable barriers/edge protection
-
Contractors were using there own barriers at all times
-
There was no Smoking or Vaping on site
-
There was a suitable facility to store and dry PPE
-
Specialist Welfare was in place as required for the task or to meet cultural needs
-
All excavations were being managed correctly
-
All off site works relating to our project were compliant and safe
Fire and Emergency
-
Calibrated Fire Fighting equipment was available on site
-
Means of raising the fire alarm was in place and is suitable for the site conditions
-
The muster point was clearly defined
-
Fire Drills have taken Place
Accidents/Incidents
-
All Accidents and Incidents were being reported and recorded
-
Close Calls are being reported and recorded
-
Accidents, Incidents and Close Calls have been closed out
Quality
-
Contractors were undertaking Quality Inspections as per the defined Hold Points
-
A. & H. Management team have undertaken Quality Inspections at defined Hold Points and Witness Points
-
Quality Issues have been closed out with the relevant contractors
Site Documents
-
The documents inspected at the time were completed correctly and compliant
-
The Construction Phase Plan is in place and is being reviewed and updated by the Site Management Team
-
The RAMS review process is being followed by the site management team
-
Temporary Works designs were in place, as required for the on site activities
Environmental
-
Dust was being managed and controlled
-
Noise controls were in place
-
Vibration Control measures were in place
-
Roads and footpaths were clean
-
COSHH was being managed
-
Waterways were protected
-
Tree Protection Measures were in place
Health Surveillance/Management - inc signage/PPE
-
Health Surveillance has been undertaken
-
Vibration Control measures were in place and were being followed
-
Dust Control Measures were in place and were being followed
-
Noise Control Measures were in place and were being followed
Management Resources
-
All contractors had a named and competent supervisor on site at all times
-
The named supervisor was managing all operatives and contractors under their control
-
The supervisors were ensuring full compliance with all rules, procedures and Safe Systems of Works relating to their activities
Safety Inspections/Audits/Briefings
-
A. & H. Management team have been undertaking regular safety audits
-
All contractors supervisors were undertaking weekly safety audits
-
The Contractors have provided detailed Safety Audits which were undertaken by the Contracts Manager or HS advisor
-
A. & H. Management team have undertaken weekly Site Safety Briefings with the contractors
-
The contractors supervisor is undertaking daily/weekly safety briefings with all operatives and contractors under their control
-
Regular Tool Box Talks have been completed with the contractors and by the contractors