Title Page
-
Site conducted
-
Site Project Manager
-
Contracts Manager
-
Conducted on
-
Prepared by
-
Location
-
undefined
Site Entrance/Access - including off site/site perimeter
-
The external area is clean, tidy and safe for the general public
-
The gates were secured or being managed at all times
-
There is a defined pedestrian access point
-
The pedestrian access route was safe, well lit and has directional signage to the welfare/site office
-
Parking was available for Contractors and Visitors
-
Directional signs for operative/visitor parking is in place
-
A gate person was managing the access/egress
-
Site Hoarding is erected at the site entrance as per the defined standard
-
The managers contacts details were on display at the entrance
-
Construction vehicles are not blocking the footpath or highway
-
The footpaths and highway is free from dirt/mud
-
No materials or equipment are stored outside of the site boundary
Site Cleanliness and Housekeeping inc waste management and control
-
The site is clean and tidy with materials and waste being stored in a safe manner
-
Waste is being secured to prevent migration around and off the site i.e. secured skips/bins
-
Waste is being separated as required
-
All contractors are managing/removing their waste on a daily basis and keeping their work area clean
-
The offices and Site Welfare (including contractors welfare) were being maintained in a clean and tidy manner
-
No materials, tools or equipment were being stored in any welfare or site offices/meeting rooms/toilets
On and Off Site Safety - as per the controls in the CPP, CEMP, RAMS etc
-
Pedestrian routes are in place to and from the welfare/work area
-
Ground conditions are clean, compact and safe for plant operations and operatives
-
All materials are stored in a safe and secure manner
-
All operatives are wearing A.& H. logoed PPE
-
Operatives are wearing the correct PPE for the task and are wearing it correctly
-
No Radios are being used, including personal radios on phone etc
-
Mobiles Phones are not being used in the construction area
-
Plant operating areas are segregated by the contractors using their own barriers
-
Work at Height areas are being segregated by the contractors using their own barriers to prevent access
-
Any equipment inspected/checked is in good order or is taken out of service
-
Site Safety Access/Egress Lighting is installed to provide safe access to and from the work area and within the work area
-
Areas where falls could occur are segregated sufficiently with suitable barriers/edge protection
-
Barriers/toe boards are installed where materials or equipment could fall from height
-
Contractors are using there own barriers at all times
-
There is no Smoking or Vaping on site
-
There is a suitable drying room to store and dry PPE
-
Specialist Welfare was in place as required for the task or to meet cultural needs
-
All excavations are being managed correctly including barriers, access, design, inspections
-
All off site works relating to our project are compliant and safe
-
All Work at Height is being undertaken in a safe manner inc correct equipment for the task
-
All deliveries are being managed correctly, including lorries being banked when reversing
-
All highways/footpath works are being managed correctly inc signs, traffic management, supervision
-
Fire Hazards are being managed and controlled i.e. Hot Works, fuel storage
-
All visitors/client personnel are being escorted around the site
Fire and Emergency Processes and controls
-
Calibrated Fire Fighting equipment is available on site Powder and CO2 extinguishers
-
Means of raising the fire alarm was in place and is suitable for the site conditions i.e. Linked alarms, fire bells
-
The Muster Point is clearly defined
-
Fire Drills are taking Place on a regular basis and are being recorded
-
Fire Escape routes are clearly defined
-
Fire Plans are available on site and have been reviewed with the contractors
Accidents/Incidents
-
All Accidents and Incidents are being recorded and reported to head office
-
Close Calls are being being recorded and reported to head office
-
Any Accident, Incident or Close Calls has been closed out and the actions recorded
-
RIDDOR reportable accidents or Incidents are being recorded and reported to head office
-
Any theft from site is being recorded and reported to head office
Quality - including cladding, drainage, concrete etc
-
Quality audits are being undertaken at defined witness points
-
Quality Inspections are being undertaken at defined Hold Points on cladding, drainage, concrete etc
-
A. & H. Management team have undertaken Quality Inspections at defined Hold Points and Witness Points
-
Evidence of drainage surveys has been provided and confirmed as acceptable before hard standings are installed
-
Cladding and concrete inspectors are undertaking inspections and providing reports
-
Any Quality issues noted, have been reviewed and closed out with the relevant contractors
Site Documents inc Permits, Registers, Inspections
-
All RAMS, permits, registers and inspections are in place as required for the work taking place
-
The permits, registers and inspections are being completed on the A&H paperwork, as part of our ISO procedure
-
The documents inspected at the time, were completed correctly and compliant i.e. permits, registers, inspections
-
The Construction Phase Plan is in place and is being reviewed and updated by the Site Management Team
-
The RAMS review process is being followed by the site management team
-
Temporary Works designs are in place for all Temporary Work activities
-
Temporary Work documents are being completed inc the TW register, permit to proceed etc
-
Up to date site service drawings are available and are being reviewed with any contractor who is breaking ground
-
Up to date service drawings are being issued with the permit to excavate/break ground
-
Written evidence of Live Service isolation is available, where contractors are required to work on or near them
-
All Non Conformances are being recorded and reported to head office
Environmental Management inc noise, dust, vibration
-
Dust is being managed and controlled using either water suppression, vacuum, controlled construction methods
-
Noise controls were in place i.e noise screens, monitoring, set working hours for noisy activities, low noise equipment/processes
- Yes
- No
- N/A
- Advisory
- Not Checked During Audit
-
Vibration Control measures were in place i.e. monitoring, low vibration equipment/processes
- Yes
- No
- N/A
- Advisory
- Not Checked During Audit
-
COSHH is being managed with fuels, hazardous substances stored and disposed of correctly
-
Waterways are protected with drains/gullies having filters, sand bags
-
Tree Protection Measures are in place i.e. sign, barriers, defined work zones
-
Flora/Fauna controls are in place i.e. ocologist, environmentalist, set working times/periods to protect mammals/birds
Health Surveillance/Management - inc signage/PPE
-
Health Surveillance is being undertaken including on pre-induction
-
Vibration Control measures ar in place and were being followed i.e. set working times, list of vibratory equipment
-
Dust Control Measures were in place and were being followed i.e. Vacuums, dust suppression, respiratory equipment
-
Noise Control Measures were in place and were being followed i.e. hearing protection, safety signs, defined zones
- Yes
- No
- N/A
- Advisory
- Not Checked During Audit
-
Evidence of Health surveillance is in place for operatives working with asbestos
Management Resources
-
All contractors had a named and competent supervisor on site at all times
-
The named supervisor is managing all operatives and contractors under their control
-
The supervisors are ensuring full compliance with all rules, procedures and Safe Systems of Works relating to their activities
Safety Inspections/Audits/Briefings/Non Conformance
-
All contractors supervisors are undertaking weekly safety audits
-
The Contractors have provided detailed Safety Audits which were undertaken by their Contracts Manager or HS advisor,
-
A. & H. Management team are undertaking weekly Site Safety Briefings with the contractors
-
The contractors supervisor is undertaking daily/weekly safety briefings with all operatives and contractors under their control
-
Regular Tool Box Talks have been completed with the contractors and by the contractors
-
Contractors Directors, Contracts Managers or Supervisors are managing and issuing Non Conformances