Site Entrance/Access - including off site/site perimeter

  • The external area is clean, tidy and safe for the general public

  • The gates were secured or being managed at all times

  • There is a defined pedestrian access point

  • The pedestrian access route was safe, well lit and has directional signage to the welfare/site office

  • Parking was available for Contractors and Visitors

  • Directional signs for operative/visitor parking is in place

  • A gate person was managing the access/egress

  • Site Hoarding is erected at the site entrance as per the defined standard

  • The managers contacts details were on display at the entrance

  • Construction vehicles are not blocking the footpath or highway

  • The footpaths and highway is free from dirt/mud

  • No materials or equipment are stored outside of the site boundary

Site Cleanliness and Housekeeping inc waste management and control

  • The site is clean and tidy with materials and waste being stored in a safe manner

  • Waste is being secured to prevent migration around and off the site i.e. secured skips/bins

  • Waste is being separated as required

  • All contractors are managing/removing their waste on a daily basis and keeping their work area clean

  • The offices and Site Welfare (including contractors welfare) were being maintained in a clean and tidy manner

  • No materials, tools or equipment were being stored in any welfare or site offices/meeting rooms/toilets

On and Off Site Safety - as per the controls in the CPP, CEMP, RAMS etc

  • Pedestrian routes are in place to and from the welfare/work area

  • Ground conditions are clean, compact and safe for plant operations and operatives

  • All materials are stored in a safe and secure manner

  • All operatives are wearing A.& H. logoed PPE

  • Operatives are wearing the correct PPE for the task and are wearing it correctly

  • No Radios are being used, including personal radios on phone etc

  • Mobiles Phones are not being used in the construction area

  • Plant operating areas are segregated by the contractors using their own barriers

  • Work at Height areas are being segregated by the contractors using their own barriers to prevent access

  • Any equipment inspected/checked is in good order or is taken out of service

  • Site Safety Access/Egress Lighting is installed to provide safe access to and from the work area and within the work area

  • Areas where falls could occur are segregated sufficiently with suitable barriers/edge protection

  • Barriers/toe boards are installed where materials or equipment could fall from height

  • Contractors are using there own barriers at all times

  • There is no Smoking or Vaping on site

  • There is a suitable drying room to store and dry PPE

  • Specialist Welfare was in place as required for the task or to meet cultural needs

  • All excavations are being managed correctly including barriers, access, design, inspections

  • All off site works relating to our project are compliant and safe

  • All Work at Height is being undertaken in a safe manner inc correct equipment for the task

  • All deliveries are being managed correctly, including lorries being banked when reversing

  • All highways/footpath works are being managed correctly inc signs, traffic management, supervision

  • Fire Hazards are being managed and controlled i.e. Hot Works, fuel storage

  • All visitors/client personnel are being escorted around the site

Fire and Emergency Processes and controls

  • Calibrated Fire Fighting equipment is available on site Powder and CO2 extinguishers

  • Means of raising the fire alarm was in place and is suitable for the site conditions i.e. Linked alarms, fire bells

  • The Muster Point is clearly defined

  • Fire Drills are taking Place on a regular basis and are being recorded

  • Fire Escape routes are clearly defined

  • Fire Plans are available on site and have been reviewed with the contractors

Accidents/Incidents

  • All Accidents and Incidents are being recorded and reported to head office

  • Close Calls are being being recorded and reported to head office

  • Any Accident, Incident or Close Calls has been closed out and the actions recorded

  • RIDDOR reportable accidents or Incidents are being recorded and reported to head office

  • Any theft from site is being recorded and reported to head office

Quality - including cladding, drainage, concrete etc

  • Quality audits are being undertaken at defined witness points

  • Quality Inspections are being undertaken at defined Hold Points on cladding, drainage, concrete etc

  • A. & H. Management team have undertaken Quality Inspections at defined Hold Points and Witness Points

  • Evidence of drainage surveys has been provided and confirmed as acceptable before hard standings are installed

  • Cladding and concrete inspectors are undertaking inspections and providing reports

  • Any Quality issues noted, have been reviewed and closed out with the relevant contractors

Site Documents inc Permits, Registers, Inspections

  • All RAMS, permits, registers and inspections are in place as required for the work taking place

  • The permits, registers and inspections are being completed on the A&H paperwork, as part of our ISO procedure

  • The documents inspected at the time, were completed correctly and compliant i.e. permits, registers, inspections

  • The Construction Phase Plan is in place and is being reviewed and updated by the Site Management Team

  • The RAMS review process is being followed by the site management team

  • Temporary Works designs are in place for all Temporary Work activities

  • Temporary Work documents are being completed inc the TW register, permit to proceed etc

  • Up to date site service drawings are available and are being reviewed with any contractor who is breaking ground

  • Up to date service drawings are being issued with the permit to excavate/break ground

  • Written evidence of Live Service isolation is available, where contractors are required to work on or near them

  • All Non Conformances are being recorded and reported to head office

Environmental Management inc noise, dust, vibration

  • Dust is being managed and controlled using either water suppression, vacuum, controlled construction methods

  • Noise controls were in place i.e noise screens, monitoring, set working hours for noisy activities, low noise equipment/processes

  • Vibration Control measures were in place i.e. monitoring, low vibration equipment/processes

  • COSHH is being managed with fuels, hazardous substances stored and disposed of correctly

  • Waterways are protected with drains/gullies having filters, sand bags

  • Tree Protection Measures are in place i.e. sign, barriers, defined work zones

  • Flora/Fauna controls are in place i.e. ocologist, environmentalist, set working times/periods to protect mammals/birds

Health Surveillance/Management - inc signage/PPE

  • Health Surveillance is being undertaken including on pre-induction

  • Vibration Control measures ar in place and were being followed i.e. set working times, list of vibratory equipment

  • Dust Control Measures were in place and were being followed i.e. Vacuums, dust suppression, respiratory equipment

  • Noise Control Measures were in place and were being followed i.e. hearing protection, safety signs, defined zones

  • Evidence of Health surveillance is in place for operatives working with asbestos

Management Resources

  • All contractors had a named and competent supervisor on site at all times

  • The named supervisor is managing all operatives and contractors under their control

  • The supervisors are ensuring full compliance with all rules, procedures and Safe Systems of Works relating to their activities

Safety Inspections/Audits/Briefings/Non Conformance

  • All contractors supervisors are undertaking weekly safety audits

  • The Contractors have provided detailed Safety Audits which were undertaken by their Contracts Manager or HS advisor,

  • A. & H. Management team are undertaking weekly Site Safety Briefings with the contractors

  • The contractors supervisor is undertaking daily/weekly safety briefings with all operatives and contractors under their control

  • Regular Tool Box Talks have been completed with the contractors and by the contractors

  • Contractors Directors, Contracts Managers or Supervisors are managing and issuing Non Conformances

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.