Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
Store Trading Hours - Mon – Sat, Open and Close
-
Store Trading Hours - Sun, Open and Close
-
Text box for any changes to the opening hours
Personnel / Attendees
-
Store Manager
-
Ops Manager
-
Format Integrity Manager
-
Construction Manager
-
Project Delivery Manager
-
Main Contractor
-
Refrigeration Contractor
-
Security Contractor (Case / Mitie)
-
Others
Key Project Dates
-
First site visit
-
Asset Plan Locked *input date from Lunar programme
-
Tech approval *input date from Lunar programme
-
Quote Returns
-
Cost Validation *input date from Lunar programme
-
Pre-start meeting *input date from Lunar programme
-
Start on site *input date from Lunar programme
-
PC meeting *input date from Lunar programme
Scoping
Scope Overview
-
Scope Walkaround / Review the Asset Plan
-
Project Type
Refrigeration (Normal Lunar scope only)
-
Refrigerant Type
-
Refrigeration Case Removals
-
Consider Case removal contractor and whether the cases are suitable for the ERC? If so Weatherheads to be engaged
-
Refrigeration Case Relocations
-
Isolation Valves? *Refrigeration contractor to advise
-
Refrigeration Pipework / Drainage type *Refrigeration contractor to advise of any issues
-
Refrigeration Accessories - Shelving / Dividers / End panels required?
-
Chiller Doors install *Only if clashed with the chiller doors programme and highlighted to be included
-
No refrigeration case removals or relocations in Low Cost Lunar scope, however are there any refrigeration accessories required i.e. additional shelves, dividers?
Shelving
-
Shelving works - removals / relocation / additions
-
Top Stock installation - if not existing *Please note minimum ceiling height of 2.5m required, to be assessed with Edens that it can be incorporated. Top Stock Trolley will need to be ordered from Bunzl
-
Blinker Panels required where end bays removed, how many?
-
Semi permanent shippers (typically 8 per store) *Medicine shipper in Cat D risk stores only
-
Spirit Doors *To be included where spirits are on the shop floor in flow
Security
Bodycams
-
How many existing Bodycams are in store (*Must be operational)
-
How many new Bodycams are required? There must be 3 in total (to be ordered from IMAC with Symbol attendance required to install)
-
Is a new docking station required? (ensure there is a port for each Bodycam)
iCCTV
-
Mitie or Case Security to be engaged to complete a survey to confirm iCCTV requirements and proposal
-
What type of CCTV system does the store have?
- Analogue CCTV system
- IP CCTV system
- IP with iCCTV equipment installed
- IP with iCCTV equipment installed and live
-
If there is existing iCCTV please confirm what kit is installed? (Any kit missing will be required as new)
- Incident Support Button on Kiosk
- Incident Support Button on Sales to Warehouse door (warehouse side)
- Incident Support Button in Office
- Speaker on Salefloor (front)
- Speaker on Salesfloor (back)
- Speaker in the Warehouse
-
Is the existing iCCTV Commissioned and Live (Incident Support Buttons connecting to support centre when pressed, Speakers making announcements?). If not a commissioning visit will need to be arranged with the Security Contractor and Mitie support centre to make the system Live.
-
Is there a working CCTV monitor on the kiosk which is visible to colleagues?
-
Any other comments re iCCTV?
Digi-locks on Kiosk doors
-
Digi-locks are required to be installed on the existing kiosk doors. Are any adjustments required to facilitate the installation of a digilock?
-
Are there any gaps that would allow the door to be opened externally by reaching over or is the door a Barn door? Identify solution - installation of additional perspex or if a new kiosk door may be required?
-
Add photos of the existing kiosk door
Secure Kiosk / Covid Screens
-
Secure Kiosk Required? *This will be identified on the Lunar programme
-
Eden to be engaged to complete a Secure Kiosk survey and proposal (Richard.Lock@eden-uk.com).
-
Highlight any issues that may impact secure kiosk install, columns / shutters etc?
-
Is there a basement underneath the Kiosk? *Structural survey required by RLB if yes
-
Security Contractor to be engaged to relocate CCTV monitor to a position visible to colleagues in the secure kiosk, and to disable panic buttons on the till positions prior to install and enable post install.
-
IMAC to be engaged to remove / reinstate till IT and the AST attendant screen to enable secure kiosk install
-
Add photographs of the existing Kiosk
-
Are there existing Covid screens on the counter positions? If existing and in good condition - Leave in situ, if existing and damaged - Remove.
-
Any additional call outs regarding the kiosk / frontline?
-
Add photos of existing frontline including any Covid screens and large gaps
Signage
-
Are the opening hours changing?
-
Is a new service panel required to replace the graphics or new opening hour panels for existing service panels?
-
Are new Totem opening hours panels required?
-
Category signage relocations - only possible to ascertain when Stage 6 released however identify if hanging signs or fixed to wall / frieze?
-
Bus stop signs and magnetic fridge signs to be removed by the Main Contactor
Other Equipment
-
Coffee Machine Addition / Removal / Relocation? *Alison Kearsley in Concessions to be engaged for removals / relocations
-
Hot food Counter Removal / Relocation? If removal can unit be taken by the ERC for re-use?
-
Parcel Lockers - has the store been identified in clash with the lockers install programme
-
Are there potential locations for lockers (select all that apply)?
- External
- Internal
- No locations possible
-
Please identify potential locker locations and take photographs to share with InPost *Contractor to provide separate cost for electrical services install if locker confirmed.
-
New shelving stripping? *By exception only where essentially required due to significant damage or missing
-
Feature light tracking removal? *Only where an electrician is already required for other scope items
BWIC / Making good
-
Floor Repairs - replacement floor tiles, patch repairs, colour match filler etc
-
Wall repairs - Boxing in / Frieze repairs etc
-
Bump post removal / relocation - where refrig / shelving removed?
-
Any other additional BWIC?
-
Builders Clean? *Note - this is by exception only, not included as standard however where scope permits and is deemed necessary then include
Store Details & Logistics
Site Matters
-
Site Set-up
-
Delivery Restrictions
-
Confirm Delivery / Removal route for Refrig / Cofffee / Hot food and check Dims
-
Access Restrictions - are adjustments required to get equipment out i.e. Autodoors / Door frames / Bollards?
-
Noise Restrictions / Local Residents? *identify if early or full closure may be required to deliver the works, to be flagged to Lunar working group
-
Shared Landlord Areas / Landlords Consent required?
-
Site Photographs: allow picture input
Store Reports
-
Seasonal Impact?
-
Asbestos Refurb survey
-
Refrig Condition
-
Electrical condition
-
Any Maintenance issues for resolution to be flagged to the FMBP
-
Store Services (Deliveroo, Uber, parcel deliveries etc.)
Next Steps
-
CAD Amends *FIM to take back to drawing governance to enable locked CAD
-
Cost Plan Requirements
- Main Contractor
- Refrigeration Engineer
- Refrigeration Removal contractor
- Epta - Refrig Spare Parts
- ERC
- Edens - Shelving
- - Edens Secure Kiosk
- Security Contractor - Mitie / Case
- Covid screens - Bunzl / Eden
- IMAC - Bodycams, IT moves
- Signage Contractor - Omega / Pearce
- Bunzl
- Coffee - Costa / Seattle /Everground
- Nuttalls
- External Merchandisers
- Asbestos Consultant
-
Programme Requirements - anticipated OOH shifts / day shifts
-
Risks
-
Outputs & Actions