Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Untitled Page
MEWPS currently onsite
-
Is there a designated area for safe storage of MEWPS after use? (Inside or parked securely)
-
How many MEWPS are currently onsite? Inspect at least 10%
-
Are there any battery-powered MEWPS on site that require specific safety considerations?
-
Is there suitable facilities for charging MEWPs? (Consider electrical connections and weight on flooring, etc.)
-
Are there Fuelling facilities for Diesel MEWPs? are practices controlled?
MEWP Check
-
What type of MEWP is being checked?
- 3A) Mobile Vertical (Scissor)
- 3B) Mobile Boom (Cherrypicker)
- 1B) Static Boom (Cherry picker)
- 1A) Static Vertical (Scissor )
- MCWP) Mast Climbing work platform (all types)
-
Does the machine have an appropriate certificate of thorough examination?
-
When is the MEWP due for its next Certificate of thorough examination?
-
Photograph of the GA1 Certificate / Certificate of Thorough examination
-
Please upload a pictures showing the current condition of the MEWP 1. (Control Panel, Overall condition, Tyres)
-
Does the Emergency Stop features work? (Both basket and on ground)
-
Is the machine operable from ground level? (keys available and check on the operations)
-
Name of Operator of MEWP
-
Is there evidence that the Operator has relevant training for this type of MEWP? (E.g.IPAF, PAL)
-
Is the operator wearing an appropriate harness? (Fall arrest/ Fall Restraint, lanyard length)
-
How would you rate the overall (visual) condition of the safety harness? (E.g. all buckles ok/ worn correctly/ no cuts damage to webbings/ worn correctly?)
-
Does the Spotter/ banksman know how to work the machine from ground level in case of emergency? (Ask for a talk through the process and/or a demonstration)
Sign off
-
Inspection by
-
Principal Contractor sign off