Information
-
Document No.
-
Audit Title
-
Client / Site
-
Site Contact
-
Conducted on
-
Previous Inspection Date
-
Prepared by
-
Location
-
Personnel
-
Company division
- Demolition
- Infrastructure
- Haulage
- Mardyke
- ABW
Excutive Summary
Report Summary
-
Non conformance summary
-
Category of non conformance
- 1st aid
- displayed info
- paperwork
- welfare
- COSHH
- fire
- signage
- work @ height
- excavations
- plant and machinery
- lifting equipment
- crane
- edge protection
- temporary works
- hot works
- isolations
- portable tools
- hoist
- MEWPS
- hoarding and fencing
- traffic routes
- access / egress
- PPE
- housekeeping
- environmental
- health hazards
- public interface
- site security
Previous Inspection
-
Have items from previous inspection report been actioned?
-
If No, state what action not completed and reasons?
First Aid
-
Have accidents been entered in the site incident book?
-
Details of the reported incidents.
-
Images relating to this category.
-
1st aid kits present and in date?
-
1st aider present onsite and details displayed?
-
Recommended 1st aider ratio:
1 EFAW or FAW person per 50 people or part thereof
Displayed Information
-
Is a signed/ in date Health And Safety Policy displayed?<br>
-
Safety Plan 1<br>Is there a site fire plan displayed?
-
Safety Plan 2<br>Is there A&E information displayed?
-
Have the Insurances certificates been displayed?
-
Is F10 displayed?
-
EA registration displayed?
-
Company environmental policy displayed?
-
BSI certificate displayed?
-
Asbestos notification displayed?
-
SHEQ bulletins up to date and relevant
Project paperwork
-
Have all staff been inducted?
-
Are Method Statements present to cover all works?
-
Have method statements been briefed out?
-
Have method statements been uploaded to Ezone?
-
Have risk assessments been identified for each task?
-
Evidence of Task Training
-
Asbestos survey present onsite and communicated to staff?
-
Do all sub-contractors have suitable RAMS?
Site Welfare
-
Suitable number of toilets onsite?
-
Men only (mains water toilets)
1-15 = 1 toilet and 1 urinal
16-30 = 2 toilet and 1 urinal
31- 45 = 2 toilet and 2 urinal
46-60 = 3 toilet and 2 urinal
For chemical toilets double the provision -
Warm water supplied for washing?
-
Adequate supplies of soap etc?
-
Canteen facilities present (including microwave, fridge, drinking water and kettle)?
-
Drying room present?
-
All areas adequately heated and lit?
-
Welfare facilities clean and in good condition?
COSHH
-
Have relevant COSHH Assessments been identified?
-
Are all COSHH items suitably stored?
Fire Precautions
-
Fire risk assessment completed?
-
Assembly point present and demarcated?
-
Means of raising fire alarm adequate ( can be heard over site noise)?
-
Responsible persons nominated and suitably trained?
-
Fire drill completed?
-
Fire routes clearly defined and signed?
-
Fire extinguishers present on exit routes?
-
Fire extinguishers present to relevant areas (welfare area, refuel area, flammable store etc)?
-
Fire extinguishers in date and seals in place?
-
Emergency lighting present and tested?
Safety Signage
-
Site compound suitably signed
-
Site access points clearly identified?
-
Signage displayed at work areas identifying risks (e.g. No access, high noise areas etc)?
Work at Height
-
Are ladders being used by Erith staff, If so are they suitable (class 1) and free from defect and have risk assessment / permit for the task?
-
Are ladders being used by sub contractors, If so are they suitable (class 1) and free from defect and have risk assessment / permit for the task?
-
Have podiums been inspected and are suitable for use?
-
Have all towers been inspected and are suitable for use?
-
Have towers been erected by PASMA trained staff?
-
Is all fixed scaffold suitable for use ?
-
Toe boards fitted (150mm)
Intermediate rail (no more than 470mm above toe board)
Top rail (950mm)
All ladders secured -
Are Haki stairs suitable (no gaps in handrail - see note above)?
-
Have scaffold inspections been completed?
-
Is scaffold overloaded?
-
Are any works on fragile surfaces being completed?
-
If yes, have suitable fall protection means been established? (access equipment, safety nets, etc)?
-
Do site works involve harness use?
-
Are staff suitably trained in use of harnesses?
-
Is correct lanyard being used?
-
Are anchor points suitable?
-
Is equipment free from defect and have relevant inspection?
Excavations
-
Permit to dig in operation and up to date?
-
All sides suitably supported?
-
Access into / out of excavation is secured (fixed ladder)?
-
Stock pilling of materials within 2 metres of excavation?
-
Daily checks on excavation completed?
-
Edge protection present to excavation?
-
Is safety signage erected warning of excavations?
Plant and machinery
-
Are operators completing daily checks?
-
Relevant inspections completed weekly?
-
All operators are suitably trained?
-
Plant in good working order (mirrors, beacons etc all present)?
-
Quick hitch safety pins present?
-
Banksman present?
-
Images relating to this category.
Lifting equipment and accessories
-
All equipment has valid inspection certificate?
-
Equipment is free from defect?
-
All equipment has known SWL?
Crane
-
Lifting plan onsite?
-
Competent persons onsite to oversee the lift (Appointed person)?
-
All persons involved in the operation are suitably trained?
-
Is pilling mat inspections completed (weekly)?
-
Does the emergency plan cover crane operations?
Edge Protection
-
Is fixed edge protection present as required?
-
Is all edge protection securely fixed and positioned?
Temporary works
-
All temporary works recorded on register?
-
Have all temporary works been inspected?
-
Are temporary works drawings and calculations available onsite?
Hot works
-
Permit to work system in place and being adhered to?
-
Gas bottle storage suitable (lockable cage, signed, away from ignition sources and site boundary)?
-
All hoses free from damage / no temp repairs?
-
Bottles secured on trolley when in use?
-
Operatives wearing suitable PPE?
-
Area suitably ventilated?
-
Staff suitably trained and face fitted?
Isolations
-
Electrical isolation certificates present?
-
Water isolation completed?
-
Gas isolation certificate present?
-
Data services isolated?
-
M&E services isolated?
-
All services suitable marked onsite?
Portable tools and Equipment
-
All portable tools, leads etc have valid PAT certificate?
-
Tools and leads are free from defect?
-
Suitable storage for tools and equipment?
-
All tools fitted with appropriate guards?
-
HAV record sheets being completed?
-
All leads suitable managed to prevent hazards?
Hoist
-
Commissioning certificate present for hoist?
-
Statutory inspections of equipment completed (6 monthly)?
-
Staff trained in operation of hoist?
MEWPS
-
All MEWPS have valid inspection certificates?
-
Pre use checks being completed?
-
Operatives suitably trained?
-
Harnesses being worn (as required)?
-
Works being completed safely?
-
Emergency set down procedure recorded?
Hoarding and fencing
-
Site secured through fixed hoarding (if yes continue below)?
-
Hoarding prevents unauthorised site access?
-
Hoarding in good order (no damage, protruding nails etc)?
-
Hoarding inspected weekly (as per temporary works requirements)?
-
All herras fencing suitably supported and double clipped?
Traffic Routes
-
Site traffic plan has been displayed?
-
Vehicle routes are clearly segregated and signed?
-
Vehicles have separate entrance into site?
-
Suitable locations defined for loading and unloading?
-
Site speed limit established and adhered to?
-
Vehicle routes are suitable?
-
Site car parking adequately controlled?
Access and Egress
-
Separate pedestrian access point into site?
-
Pedestrian access routes established and demarcated?
-
All access routes have suitable flooring?
-
Access routes kept free from obstructions?
-
All areas have sufficient lighting?
PPE
-
Site PPE rules established and displayed?
-
PPE rules being adhered to onsite?
-
Spare PPE available onsite?
Housekeeping
-
Designated areas for waste storage?
-
Access routes clear of debris?
-
All areas suitably cleared of waste?
Environmental
-
Fuel present in bunded containers?
-
Spill kits present onsite?
-
Drips trays present to fixed plant and at refuelling areas?
-
Suitable storage for hazardous waste items?
-
Waste collection tickets retained?
Health hazards
-
Weils disease risk onsite (if yes continue below)?
-
Risk assessment and control measures implemented?
-
Pigeon guano risk onsite (if yes continue below)?
-
Risk assessment and control measures implemented?
-
Sharps risk onsite (if yes continue below)?
-
Risk assessment and control measures implemented?
-
Foul water risk onsite ( if yes continue below)?
-
Risk assessment and control measures implemented?
-
Legionella risk onsite ( if yes continue below)?
-
Risk assessment and control measures implemented?
-
Carbon Monoxide risk onsite ( if yes continue below)?
-
Risk assessment and control measures implemented?
Public Interface
-
Dust monitoring completed?
-
Noise monitoring completed?
-
Any complaints from neighbours received?
-
Evidence of debris outside of site boundary?
Site security
-
Is site suitably secured to prevent trespass out of hours?
-
Access points to scaffold protected?
General Observations
-
General non-conformance noted?
-
General non-conformance noted?
-
Positive health and safety action noted?
-
Positive health and safety action noted?
Audit acceptance
-
Audit issued to (name):
Recipients Comments
Close Out Actions
-
24 hour close out
Item
-
Audit finding
-
Add media
-
Root causality
- lack of training
- behavioural failing
- lack of resources
- sub-contractor failing
- supply chain failure
- system failure
-
Close out action
-
Completed by (sign and date)
-
3 day close out
Item
-
Audit finding
-
Add media
-
Root causality
- lack of training
- behavioural failing
- lack of resources
- sub-contractor failing
- supply chain failure
- system failure
-
Close out action
-
Completed by (sign and date)
-
7 day close out
Item
-
Audit finding
-
Add media
-
Root causality
- lack of training
- behavioural failing
- lack of resources
- sub-contractor failing
- supply chain failure
- system failure
-
Close out action
-
Completed by (sign and date)