Information

  • UPRN

  • Project

  • Location
  • Start Date

  • Completion Date

  • Prepared by

    External
  • Walls

  • Roof replacement

  • Window replacement

  • Patch repair/trim around window

  • Front door replacement

  • Patch repair/trim around door

  • Rear door replcement

  • Patch repair/trim around door

  • Other

  • Chimney

  • Bathroom works
  • Bathroom replacement

  • Bathroom light replacement

  • Bathroom fan replacement

  • Other internal works

  • Other works
  • Damp works per square metre

  • Wall finishes

  • Wall tiling

  • Electrical works
  • Consumer unit replacement

  • Smoke/heat detector replacment

  • Storage heaters

  • Kitchen works
  • Socket upgrade

  • Kitchen doors replacement

  • Kitchen fan replacement

  • Heating
  • Boiler replacement

  • Radiators

  • CO2 detector

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.