Title Page
-
Project Name : Site
-
Prepared by
-
Site Name (Facility ID / Name)
-
Location / Address
-
WO number
-
Install team
SAFETY / RISK
-
If Site Crew is onsite working; ensure JSEA/JHA and Permit to Work are being used.
-
Are all risks being controlled as specified in JSEA/JHA?
-
Identify the level of traffic risk involved by accessing this chamber?
- Very low (side street / garden bed)
- Low (footpath)
- Medium (side street corner)
- High (main road / heavy traffic)
- Very High (main road intersection)
-
Are you aware of the manual handling risks involved and have they been addressed?
-
Is there a possibility of exposure to sharps?
-
Is the chamber lid(s) / cabinet easily lifted
-
Pre start completed?
Audit Scope
-
Inspection covers: Full install; Civil install only; IoT/Sensor/Comms install only
-
Pillar Box and or Pole installed - concreted in place / bolted adequately?
-
Conduits installed correctly; sealed; backfilled; draw wire; shielded above ground.
-
Solar panel fixed? (photo evidence required: picture of solar panel serial # and make / model number.
-
IoT comms installed neatly within cabinet (photo evidence required: photo of IoT comms device, including serial # and make / model number.
-
Pressure Sensor is installed with no leaks visible; cable management/neat (photo evidence required: Include photo showing closeup of make/model and serial #)
-
Please advise why. ie: to be installed
-
Aerial is installed neatly and connected to grounded structure?
COMMUNICATIONS (IoT)
-
Have the communications been commissioned, or tested for connectivity?
-
Any other final comments / photos - INSERT HERE