Title Page

  • Name Of Site

  • Image of Site Location

  • Date Of Maintenance

  • Maintenance Done By

  • Road/Farm Gate Codes

  • Main Gates Code

  • Local DNO

  • DNO Substation Name/Number - Take Photo Of ID Plate

  • Check HV Log Book Present? Please Sign In

G59 Tests

  • Simulation Of G59 Event

  • Location Of Isolation Point To Simulate G59

  • Auto Reclose Sequence Operational

HV Substation

    Substation
  • Substation Name

  • Damage - Check building interior and exterior for damage

  • Check Doors For Damage

  • Check Windows For Damage

  • Check Guttering For Damage

  • Check Roof For Damage

  • Check Building Free From Corrosion

  • Check No Water Ingress Present (Including Basement)

  • Check Sockets and Lights (Including Emergency Lights) operational

  • Check Heater Operational and set to approx 10 Degrees

  • Signage/ESQCR - Check the substation signage conforms to ESQCR Regulations

  • Check Signage For Site Name / Substation Name

  • Check Signage For Site Operator

  • Check Signage For Emergency Contact Number

  • Check Danger Notices Fitted To Substation Doors

  • (If Applicable) Check SF6 Warning Labels Fitted To Substation Doors

  • First Aid Kit

  • Check For In Date First Aid Kit

  • Check For In Date Eye Wash Kit

  • Check For In Date Defibrillator (If Applicable)

  • Check For Electric Shock Treatment Poster

  • Drawings/Documents - Check The Substation has adequate documents in place

  • Check For SLD - Is it Current and Accurate?

  • Check For Protection Study Documents

  • Check For Earthing Study Documents

  • Check For O&M Documents

  • E-STOP - Confirm Site Has Means Of Electrical Cut-Off

  • Co-Ordinate With SAP/DNO, ask for E-Stop to Be Tested

  • Confirm E-Stop Operates as Expected

  • Basement/Cable Trenches - Open The Access Point To Cable Trench or Basement. Check For:

  • Check For Water Ingress (Identify Source If Possible)

  • Check For Rodent Activity

  • Check For Sealed Cable Ducts

  • Cables - Check Cables Located In Basement For:

  • Check For Physical Damage To Exterior Of Cables

  • Check For Cable Routing Issues

  • Check For Cable Containment Damage

  • Check Bending Radius/Additional Stress on Cable Terminations

  • Earthing - Check The Buildings Earthing System and Confirm:

  • Check Metal Equipment Is Bonded

  • The Main Earth Bar has the correct dimension

  • Check Earth Cables Are Free From Damage

  • Check Earth Cables are of Sufficient Size

  • Check Earth Connections are not "Doubled Up" of have additional washers between the lug and main earth bar

  • Check The Number Of Connections is expected for the size of the site

  • Fall Of Potential test for the entire Earthing System

  • Outdoor Enclosures (Such as Outdoor TX Pen, Outdoor Substation)

  • Damage - Check External Enclosure Exterior Fencing For Damage To:

  • Check Damage To Gates

  • Check Damage To Fence Panels/Mesh Fence

  • Signage/ESQCR - Check The Enclosure Signage Conforms To ESQCR Regulations:

  • Check Signage For Site Name / Substation Name

  • Check Signage For Site Operator

  • Check Signage For Emergency Contact Number

  • Check Danger Notices Fitted To Substation Doors

  • (If Applicable) Check SF6 Warning Labels Fitted To Substation Doors

  • Access - Check That Access To The Enclosure Is Restricted By Either:

  • Check Controlled Keys In Place For Access

  • Check Interlocks With Isolated Equipment

  • Earthing - Check The Enclosure's Earthing System and Confirm

  • Check The Metal Equipment and Fencing Is Bonded

  • Check The Main Earth Bar has the Correct Dimension

  • Check The Earth Cables Are Free from Damage

  • Check the Earth Cables are not "doubled up" of have additional washers between the lug and main earth bar

  • Check the Number of Connections is as Expected for the Size of the Site

  • Weeds/Vegetation - Check Within Enclosure for Weeds/Vegetation growth:

  • Confirm the compound floor is free of weeds or is not "waterlogged"

  • Confirm the frequency of weed treatment

  • Cable Ducts - Are the Cable Ducts Sealed?

  • LV Equipment

  • Damage - Check LV Equipment Is Free From External Damage

  • Labelling - Check each piece of LV equipment is correctly labelled

  • Where possible check the LV Equipment Is Locked

  • Functions - Function check the LV Equipment, where it does not affect switching operations. If it does affect switching operations, request the SAP does this on your behalf. e.g Remote Operations Panels or Auto Change Over Panels

  • Battery Charging Unit

  • Serial Numbers - Confirm The Serial Numbers are Correct to the Database / Record Number

  • Label - Confirm All Labels Are In Place - Danger Notices and Data Plates

  • Exterior - -Check The External Condition of the Battery Charging Unit For Rust and Deformation

  • Indication - Confirm The Indication Works and Confirms The Status Of The Charger Unit

  • Type - Confirm The Manufacturer And Type Of Batteries Used

  • Replacement - Check For Records For The Battery Last Replacement Date

  • Damage - Check Each Cell For External Damage And Leaks

  • Connections - Check The Tightness Of The Battery Charger Cable Connections - AC/DC/Battery Terminals

  • Measure and Record The Overall and Individual Cell Voltage

  • Total Voltage

  • Voltage OK?

  • Individual Battery
  • Battery Voltage

  • Voltage OK?

  • Confirm The Measured and Battery Charger Voltmeter Are The Same

  • HV Switchgear

  • Switchgear Panel Information
  • Confirm Switchgear Make, Model and Serial Numbers

  • Panel Name

  • Switchgear Manufacturer

  • Switchgear Model (s)

  • Switchgear Rated Voltage

  • Switchgear Serial Number (s)

General Switchgear Information

  • Confirm Panel Identifications/Operational Labels are Present, Correct and are Correct To The SLD

  • Confirm The Following Labels Are In Place On The Switchgear:

  • Danger Notices

  • SF6 Warning Labels (If Applicable)

  • Switchgear Data Plates

  • Operational Locks - Check operational locks are in use and are fixed at the correct locations

  • SF6 Levels - Check The SF6 Level Indicator (Mechanical Gauge or Pressure LED) this should indicate there is a safe pressure of SF6 Within the unit.

  • Where there is a different arc quenching medium in place (e.g Oil / Vacuum) check that presence and safe level

  • Protection - Check Protection relays are free from trips and alarms

  • Distress/Damage - Check The External Structure of the Switchgear; it should be free from distress and damage

  • External Panels/Covers - Check Condition Of:

  • Signs Of Corrosion and Paint Condition

  • Ensure All Covers are Fitted Securely and in the Correct Position

  • Confirm Covers are Secured from Accidental Access (Require a Key Or Tool)

  • Switchgear Tools - Check Operation Tools are resent and serviceable (anti-reflex)

  • Condition Of Operating Handle

  • Condition Of Earthing Handle

  • Condition Of Charging Handle

  • Remote Control of Switchgear - Check The Remote Operating Facility is Serviceable and Free From Damage

  • Pendant - Is it serviceable and free from damage

  • Remote Operating Panel - Is it serviceable and free from damage

  • Circuit Breaker

  • Carry Out Functional Checks In Accordance With Manufacturers Instructions

  • Does The Circuit Breaker have an Operation Counter?

  • Number Of Recorded Operations

  • Is this within the manufacturers limits?

  • Disconnectors

  • Carry Out Functional Checks In Accordance With Manufacturers Instructions

  • Switch Disconnectors

  • Carry Out Functional Checks In Accordance With Manufacturers Instructions

  • Earth Switches

  • Carry Out Functional Checks In Accordance With Manufacturers Instructions

  • Fuse Switches

  • Carry Out Function Checks In Accordance With Manufacturers Instructions

  • Visually Inspect The Fuses And Fuse Holders to Ensure Free From Damage

  • Confirm HV Fuses Are Correct Rating

  • Confirm HV Fuses have been Inserted the Correct Way Around

  • Confirm The Trip Function Works

  • Interlocking - Check All Interlocking Operates In Accordance With Manufacturers Instructions. It Should not be Possible to Apply and Earth To A Live Circuit

  • Cable Compartments - Remove The Covers And Check For Internal Damage

  • Ensure The Cable Compartment is free from Corrosion and Moisture

  • Check For Signs Of Rodent Activity

  • Check The Cable Containment Is Sound and Secure

  • Cables - Check The Exterior Of The Cables are Free From Damage or signs of Deformation

  • Cables - Confirm the cables are free from additional stress and have not exceeded the minimum bending radius

  • Cable Terminations

  • Confirm the Terminations are free from Stress and Damage

  • Remove the end cap and check the captive plug is free from signs of PD

  • Confirm the Terminations are Secure

  • Confirm the Cables are Identifiable (cable markers)

  • CTs and VTs

  • Confirm both CT and VT wiring is secure

  • Confirm the CTs are not Open Circuit

  • Check The Condition of the CTs and VTs, confirm free from signs of distress

  • Where Applicable, confirm the VT fuses are in good condition and free of signs of PD/Moisture Ingress

  • Take Photo Of CTs

  • Take Photo of VTs

  • Earthing

  • Confirm the cable compartment is adequately earthed

  • Confirm suitability and condition of Cable Earths

  • Confirm suitability and condition of Switchgear Body Earths

  • Confirm Suitability and Condition of Termination Earths

  • Mechanism Compartments

  • Check The Covers for Damage and Corrosion

  • Check the mimic matches the SLD and is Correct

  • Confirm the circuit indication is operating correctly and matches the status for the CB / Earth Switch / Disconnector

  • Confirm the mechanical parts are freely moveable, apply grease/lubrication in accordance with the manufacturers instructions

  • LV Compartment

  • Remove The Covers/Open Doors and Check For Internal Damage

  • Ensure The LV compartment is free from rust and moisture

  • Confirm there are no signs of rodent activity

  • Check the Cable Containment is Sound and Secure

  • Confirm the Relays and Meters are Secure

  • Carry out a 10% Check On Cables Ensuring they are Free from External damage/rubbing or hotsports

  • Confirm the Cables are Suitable Identifiable (cable markers)

  • Carry Out a 10% Check on the terminals ensuring they are secure and cables are fitted tightly

  • Confirm The LV Compartment is Adequately Earthed

  • Protection

  • Confirm All Protection Devices are Functional and Operating Satisfactorily

  • G59 Undervoltage Test

  • Test Control Schemes Including Premag Schemes For Correct Operation

  • Primary and Secondary Injection

  • HV Transformers

  • Transformer
  • Transformer Name

  • Confirm Transformer Data Plate Present - Take Photo

  • Type Of Transformer

  • Transformer Size (KVA)

  • Voltage HV Side

  • Serial Number

  • Voltage LV Side

  • Confirm All Required Labels In Place

  • Confirm Adequate Danger Notices

  • Exterior Structure Of Transformer

  • Check the Transformer Paint Condition

  • Check The Transformer Exterior For Rust/Corrosion

  • Check The Exterior of the Transformer for Deformation

  • CAST RESIN - Clean cells thoroughly to remove dust and debris build up, and check surface for cracking

  • Oil Level - Confirm the Oil Level is above the Minimum Operating Level. This is usually identifiable via a spyglass or the protection device

  • Transformer Oil Leaks

  • Check Bushings For Signs Of Oil Leaks

  • Check All Gaskets For Signs Of Oil Leals

  • Check Bottom OF Radiators/Fins For Oil Leaks

  • Confirm Transformer Free Of Damage

  • If Leak Observed, if possible, stem the flow (tighten bolts)

  • Transformer Bund - Confirm Bund Present and Suitable

  • Confirm Bund Present and Suitable

  • Check Bund Is Free from Oil or Water

  • Confirm the Presence and Operation of the Bund Oil Pump

  • Earthing - Check The Suitability of the earths. Confirm they are secure and free from Rust

  • Locks - Check Operational Locks are in Use and in the Correct Places

  • Terminations - Confirm the Primary and Secondary Terminations are free from Damage and signs of PD or Distress

  • Remove Any Build Up of Dust and Debris from Bushings and Terminations

  • Cables - Confirm the Cables are Suitably Supported and Free From Unnecessary Stress or Signs of Damage

  • Bushings - Confirm the Bushings are free from Damage or signs of PD

  • Bushings - Check For Leaks and Tighten if Necessary In Accordance With Manufacturers Instructions

  • Cable Box - Check The Condition of the Cable Box; this should be free from excessive rust and damage

  • Clean the cable box as required

  • Covers - Check the Condition of the Cable Box Covers, Including Securing Bolts and Gaskets

  • Ducts - Confirm All Cable Ducts are Securely Sealed to Prevent Water and Rodent Ingress

  • Ventilation - Check Ventilation Is Adequate and Free From Obstructions, Clean as Necessary

  • Fans - Where Applicable, Functional Check Cooling Fan Controls and Operation

  • Breather - Confirm Breather Type

  • Does Silica Gel Require Replacing?

  • Replaced During Maintenance?

  • TX Protection

  • Max Temperature Recorded (C)

  • undefined

  • Alarm Temperature (C)

  • Trip Temperature (C)

  • Pressure Trip Setting (Bar)

  • Functional Trip Test of Transformer Protection

  • Oil Sampling Required

  • Completed Successfully?

Conclusion Report

Remedial Works Completed During Maintenance

    Remedial Work Completed
  • What was the work completed?

  • Outstanding Remedial Work

  • Remaining Remedial Works Required

  • Highlight any Serious Concerns

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.