Information
-
Project
- 1 Crown Place
- 1 Bishops Square
- 1 Triton Square
- 20 Rope Makers
- 21 Moorfields
- 22 Bishopsgate
- 25 Colonnade
- 60 London wall
- 150 Bishopsgate
- Astra Zeneca
- Battersea Phase 3
- Google KGX1
- Greenwich 206
- Lillie Square
- Nile Street
- Shard Place
- Southbank B4
- TIQ S9
- Shard Place
- Southbank B2
- Tottenham Hotspurs Football Club
- Boland's Quay
- K1
- 5 Canada Square
- Stephenson House
- Bankside Yards B3
- 150 Holborn
- 8 Bishopsgate
- 33 Charterhouse
- Nova N2 Evolved
- TIQ IQL S4
- 1 Leadenhall
- Citi Bank
- Olympia National Hotel & Central Building
-
Client
- Skanska
- Mace
- Multiplex
- Lend Lease
- Lang O' Rourke
- Canary Wharf Contractors
- Sr Robert McAlpine
- McLaren
- Wates
- Permasteelisa UK
- Bam
- ISG
- 8 Build
- Overbury
-
Subcontractors
-
Document No.
-
Conducted on
-
Prepared by
-
Location
-
Summary
Project Site Inspection
1 - RAMS / HAZARD ALERT
-
1.1 - Have Monthly Reviews of the RAMS been Carried Out?
-
1.2 - Are Hazards being recorded on GIMS Hazard Alert? (1x week)
-
1.3 - Are all accidents / incidents being reported to PUK HSQE Department
2 - SAFETY INSPECTION
-
2.1 - Have PUK Managers Inspections been Done?
-
2.2 - Have Subcontractors Safety Inspection been Carried Out?
3 - INSPECTION TOPICS
-
What will you be inspecting today?
4 - COMPETENCY
-
4.1 - Competency
-
4.2 - Actions for Others?
-
Action Required:
5 - FIRE
-
5.1 - Fire
-
5.2 - Actions for Others
-
Action Required:
6 - LIFTING OPERATIONS
-
6.1 - Lifting Operations
-
6.2 - Actions for Others
-
Action Required:
7 - PPE
-
7.1 - Is PPE compliant as per PUK Standard?
8 - WORKING AT HEIGHT
-
8.1 - Working at Height
-
8.2 - Actions for Others
-
Action Required:
10 -COSHH
-
10.1 COSHH
-
10.2 - Actions for Others
-
Action Required:
9 - PLANT / EQUIPMENT
-
9.1 - Plant / Equipment
-
9.2 - Actions for Others
-
Action Required:
11 - HOUSEKEEPING
-
11.1 - Housekeeping
-
11.2 - Welfare Area
-
11.3 - Actions for Others
-
Action Required:
12 - STORAGE AREA
-
12.1 - Storage Area
-
12.2 - Actions for Others
-
Action Required:
13 - OCCUPATIONAL HEALTH
-
3.1 - Occupational Health
Scaffold
-
Have the scaffold been inspected at an interval of no more than 7 days?
-
Has the scaffold been erected in accordance with the design provided?
-
Are scaff-tags fitted at all access / egress points?
-
Are handrails, netting and or toe boards fitted where there is a risk of persons or materials falling?
Acess and Egress
-
Access and Egress
-
Actions for Others?
-
Action Required:
Noise / Vibration / Dust
-
Noise / Vibration / Dust
-
Actions for Others?
-
Action Required
Documentation
-
Documentation
-
Actions for Others?
-
Action Required:
undefined
-
Waste Management
-
Actions for Others?
-
Action Required:
13 - ADDITIONAL INFORMATION (OTHERS)
-
undefined
SIGN OFF
SITE REPRESENTATIVE
-
Brief member of the Permasteelisa UK Site Team on the report
-
Name of PUK Site Representative briefed on the report
-
Date
-
Signed by PUK Site Representative
HSQE REPRESENTATIVE
-
To be completed by individual completing the report
-
Name of HSQE Representative completing the report
-
Date
-
Signed by HSQE Representative