Audit / Inspection
Documentation
-
Have all the relevant site environmental requirements been communicated?
-
Is the Aspects & Impacts Register in place, updated and communicated to subcontractors as required?
-
Is the environmental forms and procedures available to project team?
-
Are environmental toolbox talks being undertaken monthly as a minimum?
Hazardous Substances
-
Is the subcontractor familiar with PUK Emergency Preparedness and spill response procedure?
-
Are there bins / drums available for hazardous substances?
-
Is there a Store Cabinet (locked and labelled) for substances hazardous to the environment?
-
Are hazardous waste being collected when required by an approved waste management contractor?
-
Are spill kits available on site, and operatives familiar to use it?
Nuisance
-
Are working areas being kept in a tidy condition?
-
Any noise mitigation measures adopted when applicable? (e.g. use noise barrier / enclosure)
Waste Management
-
Is PUK waste removed off site regularly?
-
Do the Client supply separated labelled containers to segregate the waste?
-
Is the subcontractor familiar with PUK Waste Management procedure?
-
Has the Site Waste Management Plan been compiled?
Carbon Management
-
Is the subcontractor familiar with PUK Carbon Management Plan?
-
Is the Closedloop Scheme in place and operatives familiar with it?
Sustainability
-
Are all timbers /wood PEFC or FSC certified? (tickets available)
-
Are energy conservation practices adopted when practicable?
Sign Off
-