Title Page
-
Prepared by
-
Conducted on
-
Location
Site
-
Inspect asphalt; check slope for proper drainage (no puddles)
-
Inspect asphalt; check slope for proper drainage (no puddles)
-
Inspect grounds
-
Inspect fencing and gate; ensure correct operation of gate (full swing)
-
Inspect fence posts and fabric for correct material (vinyl coated black or brown)
-
Ensure that all debris has been removed from site
Wetwell
-
Inspect interior coating (cracks, blisters, loose material, exposed concrete, etc.)
-
Inspect exterior coating (coal-tar epoxy)
-
Ensure that stainless steel bolts are utilized in ductile iron piping
-
Inspect concrete penetrations (discharge piping, conduits, etc.)
-
Ensure that all penetrations are cored and link-sealed, then finished with epoxy grout
-
Check proper operation of aluminum hatch and placement per approved design
-
Check and verify opening of hatch to accommodate pump extraction
-
Verify all required signage has been provided (Confined Space, OSHA, etc.)
-
Verify operating range of (bubbler and/or floats) per approved design
-
Inspect alignment of discharge piping
-
Inspect paint used on piping
-
Inspect alignment of poly ladder rungs, ladder placement, and ladder mast bracket
Pumps
-
Pull each pump and reset; check for ease of removal, alignment of rails and proper sealing at disconnect flange
-
Inspect for any damage to paint on pump
-
Inspect cord and cord placement
Valve Vault
-
Inspect interior coating (cracks, blisters, loose material, exposed concrete, etc.)
-
Inspect paint on all mechanical piping (cracks, blisters, loose paint)
-
Inspect alignment of discharge piping
-
Verify pressure gauges are in place and the correct type
-
Check and verify opening of hatch
-
Verify all required signage has been provided (Confined Space, OSHA, etc.)
-
Ensure drain line is at grade from valve vault to wetwell
Piping
-
Ensure alignment of discharge piping between wetwell and valve vault
Electrical
-
Verify that seal-offs are sealed with sealing compound
-
Verify that pump motor leads are a continuous run from pump to control panel
-
Verify the usage of stainless steel strain reliefs on all pump and float cords
-
Verify that bubbler line is sealed off in conduit
-
Verify seal-offs are located in vault, and that all conduit penetrations are grouted
-
Verify that there has been a signed, approved electrical inspection report
-
Ensure that ground rods are accessible and have risers installed for access per specification
Control Panel
-
Ensure that wiring schematic is in door pocket
-
Ensure that "control" side of panel is oriented facing the wetwell
-
Verify UL labeling
-
Inspect enclosure for chipped paint or other damage
-
Utilize mil-thickness gauge to verify proper DFT per specification
-
Verify signed-off electrical inspection report from governing electrical inspector
-
Verify all pilot lights are operational
-
Verify all wires are labeled
-
Verify all placards are in place
-
Verify all wiring debris has been removed from enclosure
-
General inspection of field wiring
-
Conduct operation test of controls
-
Pump manufacturer to supply additional motor nameplates (crew to place on interior door)
-
Specialty products mounted and placed in interior of control panel
Telemetry System
-
Visually verify all components have been provided and pre-wired (radio, antenna, all associated wiring, alarm points, etc.)
-
Check communication link to base station
-
Inspect field wiring
-
Ensure that standard mast and antenna are supplied (standard anchoring method)
Operations Test - Pump System
-
Ensure contractor and contractor's representatives are present during start-up (electrician, control panel manufacturer, pump manufacturer, mechanical, etc. - generator manufacturer optional)
-
Verify pump rotation, reverse leads if necessary
-
Throttle valves while filling force main, if applicable
-
Draw-Down Test - Calculate actual GPM and compare to design specifications (check both pumps)
-
Add water to system and/or simulate flow; confirm operation of liquid level control system
-
Inspect sealing flange of pump for proper seal (no leaks)
-
Pull pumps and extract from wetwell; ensure clearances are maintained and pumps travel smoothly
-
on rail system; check pump cords for obvious obstructions
-
Test "high-water" and "low-water" alarms
-
Note any unusual noises/vibration
Operations Test - Generator
-
Verify diesel tank is fully fueled after manufacturer's representative has performed load run
-
Run generator in "manual" mode; check hertz, voltage, etc; verify operation of load bank
-
Verify certified affidavit of start-up and load testing from manufacturer's representative
-
Receipt of manufacturer's warranty (2-year)
-
Test "auto shut-down" on overspeed circuit
-
Test to see of genset meets decibel requirements of specifications
-
Simulate power failure (disconnect main breaker); verify automatic start of genset
-
Verify automatic transfer of power to emergency source; check for proper time delay between sequences
-
Let run for ten (10) minutes
-
Restore utility power source; verify automatic transfer, cool-down cycle time, and shut down
-
Test load bank for proper operation
-
Ensure that separate circuits are provided for battery charger and block heater
-
Test block heater and battery charge for proper operation
Completion
-
Comments
-
Inspector Name and Signature