Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared byl
-
Location
-
Personnel
-
Please answer all questions to the best of your ability. If something doesn't apply to you or this project please put N/A
This information will be used to monitor progress of the CPM and opportunities as they arise. Please be detailed as possible. If you talk with someone about something concerning this project it is your responsibility to email the conversation back to the individual your interpretation of said conversation. This is a must. -
NOTE: Make sure every detail is addressed with pictures <br>Need details of the sub contractors work take close up picture and then a wide picture showing proximity to subject matter.<br>If you have any questions please contact Joe or Jonathan immediately
General Conditions
-
Select date
-
Weather
-
Physically -mentally everything going well? Socially any social interactions
Daily Progress
-
Take a picture from the front door looking in and the rear door looking towards front of bldg (note if not able because views obstructed take two pictures if interior showing largest overall picture of space. Insert them below under media link
-
Who was on site out of ordinary today<br>Insert pics of site conditions here
-
Which trades were on site today
- Sub 1 painter
- Sub 2 electrical
- Sub 3 mechanical
- Sub 4 drywall
- Sub 5 flooring
- sub 6 plumber
- Sub 7 life safety
- Sub 8 Alarm
-
Sub 1 Painter
-
Sub 2 Electrical
-
Sub 3 Mechanical
-
Sub 4 Drywall
-
Sub 5 Flooring
-
Sub 6 Plumber
-
Sub 7 Life Safety
-
Sub 8 Alarm
-
Additional Sub
-
Additional sub
-
Any opportunities
-
OSHA WALK THRU JOB SAFETY ANALYSIS
-
Tool box topic?
-
Proper PED on site and being used?<br>
-
Proper First Aid box w supplies along with all SDS sheets on site?
-
Special request
-
Tomorrows plan of action:
-
Opportunities for tomorrow
-
If weekend-project next weeks CP