Information
-
Subdivision/Lot
-
Conducted on
-
Prepared by
-
Personal Builder
Floor Plan
Job Set Up
-
Property Pins Staked<br>Utilities in place<br>Port-a-john available<br>Proper access<br>Etc.
Job Signs
-
Signs visible and clean<br>Placed facing the road<br>Appropriate signs for stage of construction<br> Checklists, location of dumpster or portajohn, no shoes, etc. <br>(Use "0" if not there)
Exterior Site Conditions
-
Site cleanliness<br>Single trash area or dumpster<br>(Use "0" when a total disaster
Grade
-
House set at correct height<br>Garage set at correct height<br>Water drains away from house<br>Proper backfill
Foundation- Footers
-
Overall appearance<br>Ground wire installed
Foundation Block
-
Overall appearance<br>Free of major cracks<br>Uprights 25" above slab height
Concrete Flatwork
-
Finish appearance<br>Control joints<br>Correct depth of pour<br>Concrete clean out location
Framing
-
Framed to plan<br>Arches done right<br>Frame exterior walls<br>Reveals in hallways<br>Front door installed with lock<br>Bearing walls bolted, clipped, strapped
Soffit/Fascia/T111
-
General appearance<br>Nailing patterns before paint<br>Nails covered after paint<br>Seams sealed<br>
Roof
-
Shingles- straight ridges and valleys<br>Consistent color<br>Vents installed
Stucco
-
Uniform edge at ground level<br>Flashing installed correctly
Lanai/Entry/Walkways
-
Concrete finish smooth and clean<br>Edges look good<br>Sloped away from house
Mechanicals
-
Protection plates in place<br>Hose bibs secured
Insulation
-
Depth in attic with measuring stick<br>Baffles in place<br>Card signed and in place
Drywall
-
Overall appearance<br>Electric boxes cut out<br>House properly cleaned after spray<br>No excess boards in dumpster
Trim/Interior Doors
-
100% complete<br>Doors swing proper direction<br>No covered light switches<br>No missing doors<br>Excessive nails holes<br>Clean cuts and good casing corners<br>House locked
Tile
-
Tile complete, grouted, clean<br>Grout lines even<br>Tile cuts even<br>Caulking complete
Paint
-
Done to checklist requirements
Cabinets
-
Installation to plan
Interior Cleanliness
-
No trash, mud, cigarette butts on floor<br>Broom clean<br>General appearance
Trade Contractor Relations
-
Personal appearance of subs<br>Windows/doors secured when empty<br>Professional demeanor- noise/radio level<br>Work cleanliness<br>Not crowded by others<br>Communication/relationship with builder
Flooring
-
Overall appearance<br>Carpet/vinyl seams<br>Tile spacing/evenness
Scheduling
-
Previous work 100% and cleaned up<br>Correct use of materials<br>Waste not evident<br>Extra materials stacked for return