ALL SYSTEMS DESIGN CONSIDERATIONS

  • The Auditor must be conversant with BS5839, BS6266, BS7671, LPS1014 and Company Procedures.

  • Where Variations have been listed and agreed, deviation points are not added.

  • Have consultations taken place with the interested parties and where applicable have Variations agreed?

  • Please provide details / reasons

  • Where a standard has been stated as a requirement has the equipment been chosen to comply?

  • Please provide details / reasons

  • Has the Cause and Effect been documented?

  • Please provide details / reasons

ALL SYSTEMS WITH DETECTION INSTALLED

  • Is the detection fitted so that there is no point further than 7.5M from a smoke detector or 5.3M from a heat detector?

  • Please provide details / reasons

  • In pitched roofs are the detectors fitted no more than 600mm or 150mm for smoke and heat, from the apex?

  • Please provide details / reasons

  • Are the point detectors fitted on solid not mesh ceilings?

  • Please provide details / reasons

  • Are the ceiling heights below 10.5M for smoke detectors or 9.0M for Grade 1 heat detector? (Except rapid attendance)

  • Please provide details / reasons

BS5839 P1

  • Is BS5839 P1 applicable to the system being audited?

  • Is detection fitted throughout the building, including any ceiling voids greater than 800mm, the top of all voids and shafts, on the landing of all enclosed stairwells?

  • Please provide details / reasons

  • Is there detection fitted within 1.5M of all vertical shafts that penetrate the floors or ceilings?

  • Please provide details / reasons

  • Is there any detection in any "Lantern Lights" or other ceiling vents/penetrations greater than 800mm deep?

  • Please provide details / reasons

  • Where sounders are fitted are these sufficient to give sound levels as for life protection?

  • Please provide details / reasons

BS5839 P2

  • Is BS5839 P2 applicable to the system being audited

  • Is there clear and unambiguous description of the area of detection coverage?

  • Please provide details / reasons

  • If manual call points are not fitted is this clearly stated?

  • Please provide details / reasons

BS5839 L1

  • Is BS5839 L1 applicable to the system being audited?

  • Check all the points for "P1" plus is there a minimum of two sounder circuits installed throughout the building? (An external sounder is not required)

  • Please provide details / reasons

BS5839 L2

  • Is BS5839 L2 applicable to the system being audited?

  • Check all the points for "L3" plus is/are the additional detection areas(s) clearly specified?

  • Please provide details / reasons

BS5839 L3

  • Is BS5839 L3 applicable to the system being audited?

  • Are all circulation and escape routes including rooms opening onto escape routes fitted with detection?

  • Please provide details / reasons

BS5839 L4

  • Is BS5839 L4 applicable to the system being audited?

  • Are all circulation and escape routes fitted with detection?

  • Please provide details / reasons

BS5839 L5

  • Is BS5839 L5 applicable to the system being audited?

  • Are all areas within the assessed fire risk fitted with detection or have the device locations been specified by the customer?

  • Please provide details / reasons

BS5839M

  • Are all call points fitted to all exits to the open air, not in an approach, and at a maximum search distance of 45M?

  • Please provide details / reasons

  • Are call points fitted at 1.4M (+/- 200mm)?

  • Please provide details / reasons

MAINS POWER TO ALL EQUIPMENT

  • Is continuity of supply satisfactory?

  • Please provide details / reasons

  • Is the circuit dedicated?

  • Please provide details / reasons

  • Is it correctly labelled?

  • Please provide details / reasons

  • Is there not RCD fitted?

  • Please provide details / reasons

  • Is the wiring standard/enhanced category?

  • Please provide details / reasons

DETECTORS

  • Are the types of detector suitable for sitings?

  • Please provide details / reasons

  • Are sensitivities set to approved values?

  • Please provide details / reasons

  • Do the clear 2x the depth of ceiling obstructions?

  • Please provide details / reasons

  • Are detectors greater than 500mm from walls?

  • Please provide details / reasons

  • Is compliance with the relevant BS/EN claimed and are they marked to show this?

  • Please provide details / reasons

MANUAL CALL POINTS

  • Is compliance with EN54-11 claimed?

  • Please provide details / reasons

  • Are call points marked to show compliance?

  • Please provide details / reasons

ZONING

  • Are the areas per zone within the limits specified in the installation rules (2000M Square)?

  • Please provide details / reasons

  • Is the search distance less than 60M?

  • Please provide details / reasons

  • Are remote indicators supplied as needed?

  • Please provide details / reasons

  • Are the fire boundaries/compartments appropriate?

  • Please provide details / reasons

CONTROLS AND INDICATING EQUIPMENT

  • Please show control equipment

  • Is compliance with EN54-2 claimed?

  • Please provide details / reasons

  • Are all panels marked to indicate compliance?

  • Please provide details / reasons

  • Is the siting appropriate and protected?

  • Please provide details / reasons

  • Is there suitable security over access to controls?

  • Please provide details / reasons

  • Are Zone Plans displayed as required?

  • Please provide details / reasons

  • Is internal workmanship satisfactory?

  • Please provide details / reasons

DOCUMENTATION

  • Has a document box been installed containing relevant documents?

  • Please provide details / reasons

  • Are all required commissioning records complete?

  • Please provide details / reasons

  • Is there a log book?

  • Please provide details / reasons

  • Is there a certificate against the installation rules?

  • Please provide details / reasons

  • Are there satisfactory as fitted drawings?

  • Please provide details / reasons

  • Are there satisfactory O&M Manuals?

  • Please provide details / reasons

SYSTEM POWER AND STANDBY SUPPIES

  • Please show power supplies

  • Is the PSU suitable for the systems type?

  • Please provide details / reasons

  • Are batteries of a suitable type and dated?

  • Please provide details / reasons

  • Is any interconnecting wiring suitable?

  • Please provide details / reasons

  • Are battery calcs accurate, available and verified?

  • Please provide details / reasons

  • Is the standby supply to any VDU provided to satisfy installation rules satisfactory?

  • Please provide details / reasons

  • Are Spurs double pole unswitched, dedicated and labelled?

  • Please provide details / reasons

  • Are all batteries properly secured?

  • Please provide details / reasons

  • Is battery Ah less than charger o/p - load x 24 or tho contract?

  • Please provide details / reasons

  • Is load x24 + alarm x 0.5 less than the battery Ah or the site requirements (unoccupied + 24hrs)?

  • Please provide details / reasons

  • Is charger rating sufficient for full alarm load?

  • Please provide details / reasons

  • Is any interconnecting wiring suitable?

  • Please provide details / reasons

REMOTE TRANSMISSION OF ALARMS

  • If LPC installation, is it approved?

  • Please provide details / reasons

  • Is the wiring mechanically/fire protected?

  • Please provide details / reasons

  • Is fault signalled?

  • Please provide details / reasons

ANCILLARY SERVICES

  • Is the interface satisfactory?

  • Please provide details / reasons

  • Is no load taken from the fire system in the quiescent state?

  • Please provide details / reasons

  • Are they separately fused?

  • Please provide details / reasons

SERVICING AND SPARES

  • Are spares held on site without maintenance contract?

  • Please provide details / reasons

CABLES

  • Does the area per loop satisfy installation rules?

  • Please provide details / reasons

  • Does the number of zones per loop meet LPC rules (LPC installations only)?

  • Please provide details / reasons

  • Is there adequate short circuit isolation?

  • Please provide details / reasons

  • Are the location of line isolators appropriate?

  • Please provide details / reasons

  • Does the removal of detection isolate call points?

  • Please provide details / reasons

  • Are there no spurs on conventional sounder circuits?

  • Please provide details / reasons

  • Are cables of a suitable type?

  • Please provide details / reasons

  • Are cables suitably mechanically and fire protected?

  • Please provide details / reasons

  • Are joints suitably terminated?

  • Please provide details / reasons

  • Are all joint boxes labelled and on drawings?

  • Please provide details / reasons

  • Is there segregation where needed between cables?

  • Please provide details / reasons

  • Is there evidence to show that cable parameters meet manufacturers requirements?

  • Please provide details / reasons

  • Are insulation test results logged and satisfactory?

  • Please provide details / reasons

  • Are cables fixed supported to meet the requirements of BS5839-1 26.2.4 (F)?

  • Please provide details / reasons

  • Are all penetrations fire stopped?

  • Please provide details / reasons

VISUAL AND AUDIBLE ALARMS

  • Are there at least 2x sounder circuits?

  • Please provide details / reasons

  • Are the units sited to give needed sounder levels?

  • Please provide details / reasons

  • Is there logged sounder db readings?

  • Please provide details / reasons

  • Can Fire Brigade be called with alarms sounding?

  • Please provide details / reasons

  • Does the sounder pattern and frequency comply with the installation rules?

  • Please provide details / reasons

  • Are visual indicators adequate?

  • Please provide details / reasons

Workmanship

  • Grade the overall workmanship 0 to 5 where 0 is Good and 5 is Poor

Product Audit Score

  • Please select audit score

  • Please ensure a copy of this audit is sent to your QEHS Specialist for review

  • Please ensure a copy of this audit is sent to your QEHS Specialist for review

  • Please ensure a copy of this audit is sent to your QEHS Specialist for review

Environmental, Heath & Safety Summary

  • In the opinion of the auditor does the engineer work and act in a safe manner?

  • Please provide details / reasons

  • Does the engineer require any EHS refresher training? (if yes, please state requirement)

  • Please provide details / reasons

  • Does the engineer dispose of waste as per company requirements?

  • Please provide details / reasons

  • Is the engineer trained in all aspects of work related Health & Safety?

  • Please provide details / reasons

  • Has the engineer, subcontractor been issued with up to date risk assessments?

  • Please provide details / reasons

  • Did the engineer spot any near miss, unsafe acts or conditions during the audit?

  • Please provide details of the near miss or unsafe acts and if they have been correctly reported

  • Training requirements (if any)

  • Please provide details / reasons

Sign Off

  • Engineer Signature:

  • Auditors Signature:

Post audit

  • The following items are for post audit use should they be required

  • Any Notes & Observations

  • Preventative Actions (i.e. Training):

  • Proposed Preventative Action Close Out Date:

  • Corrective Actions:

  • I confirm that the corrective action has been completed

  • Add signature

  • I confirm that the preventative action has been completed

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.