Title Page
-
Job No:
-
Mould #
-
Client Name
-
Site conducted
-
Mark up the tank with the unique tank number
-
Conducted on
-
Prepared by
Tank structure Part A
-
EMPLOYEE NAME who accomplished the fit out of an item
-
DATE STARTED the fabrication of an item
-
DATE FINISHED the fitout of the item
FABRICATION
-
Review Mock up
-
1. The level of concrete sludge is aflush with the edge of a mould
-
2. The surface of concrete sludge was magged and the edges were formed with edger
-
3. All corners are cleared of excessive concrete once the product was released from the mould?
FITOUT
-
1. All noticeable honeycombs are fixed with a render?
-
QA Supervisor to address the issue to fit out lead and get it fixed
-
2. All edges and tops ground?
-
QA Supervisor to address the issue to fit out lead and get it fixed
-
3. All penetrations are painted with Everflex?
-
QA Supervisor to address the issue to fit out lead and get it fixed
-
4. All doors are patched and panted with everflex?
-
QA Supervisor to address the issue to fit out lead and get it fixed
-
5. All branding screens are accomplished with Australia Tanks signs clearly visible and not obstructed?
-
QA Supervisor to address the issue to fit out lead and get it fixed
-
6. Verify all measurements
-
QA Supervisor to address the issue to fit out lead and get it fixed
TRANSPORT INTEGRITY CHECK
-
Attache photos of all marks
-
1. REVIEW ORDERS AND DRAWINGS TO CHECK ALL TANKS ARE MARKED CORRECTLY
-
QA Supervisor to address the issue to fit out lead and get it fixed
-
2. FINAL LOAD CHECK ALL ITEMS LOADED ACCORDING TO DRAWINGS AND PLANS, INC RISERS, SIKA FLEX, ETC
-
QA Supervisor to address the issue to fit out lead and get it fixed
-
Attache photo of delivery docket
-
3. ENSURE DRIVER HAS CORRECT DELIVERY ADDRESS, AND IS AWARE OF ONSITE ARRIVAL TIME AND CONTACTS
-
QA Supervisor to address the issue to Production Supervisor and get it fixed
DRIVER CONTACT DETAILS
-
Name:
-
Contact phone #
-
DISPATCH DATE
-
Email link to PDF Report to nash@australiantanks.com