FABRICATION
-
DATE STARTED the fabrication
-
1. Have all steel elements of the shaft been tightened as per drawings?
-
QA Supervisor to address the issue to fit out lead and get it fixed
-
2. Have all steel elements of the base been tightened as per drawings?
-
QA Supervisor to address the issue to fit out lead and get it fixed
-
3. Have all steel elements of the surround been tightened as per drawings?
-
QA Supervisor to address the issue to fit out lead and get it fixed
-
4. Have all steel elements of the lid been tightened as per drawings?
-
QA Supervisor to address the issue to fit out lead and get it fixed
-
Please attached the concrete test report from the supplier as an evidence
-
5. Has concrete been supplied as per concrete specification?
-
6. Have all the stainless steel measurements been respected during the fabrication and assembling processes?
-
QA Supervisor to address the issue to fit out lead and get it fixed
VERIFY ALL MEASUREMENTS
-
1. What is the diameter of the base in mm?
-
2. What is the depth of the base in mm?
-
3. What is the depth of the main shaft in mm?
-
4. What is the internal diameter of the shaft in mm?
-
5. What is the external diameter of the shaft in mm?
-
6. What is the depth of the surround in mm?
-
7. What is the internal diameter of the surround in mm?
-
8. What is the depth of the lid in mm?
-
9. What is the diameter of the lid at FSL in mm?
-
10. What is the overall depth of the assembled product in mm?
FITOUT
-
EMPLOYEE NAME who accomplished the fit out of an item
-
DATE FINISHED the fitout of the item
-
1. All noticeable honeycombs are fixed with a render?
-
QA Supervisor to address the issue to fit out lead and get it fixed
-
2. All edges and tops ground?
-
QA Supervisor to address the issue to fit out lead and get it fixed
-
3. All penetrations are painted with Everflex?
-
QA Supervisor to address the issue to fit out lead and get it fixed
-
4. All branding screens are accomplished with Humes signs clearly visible and not obstructed
-
QA Supervisor to address the issue to fit out lead and get it fixed
-
5. Has the frame of the 600mm class D solid cover been cast into the lid?
-
QA Supervisor to address the issue to fit out lead and get it fixed
-
6. Have the tank and lid been marked to be aligned onsite for assembly?
-
QA Supervisor to address the issue to fit out lead and get it fixed
-
7. Have inlet and outlet penetrations been marked "inlet" and "outlet" respectively?
-
QA Supervisor to address the issue to fit out lead and get it fixed
VERIFY ALL FITOUT MEASUREMENTS
-
1. What is the diameter of inlet core hole mm?
-
2. What is the diameter of outlet core hole mm?
-
3. What is the distance between the centers of inlet and outlet core holes in mm?
-
4. What is the DN (Diameter nominal/internal diameter of a pipe) of the outlet stub in mm?
-
5. What is the DN of the inlet stub in mm?
-
6. What is the depth to invert (inlet) measuring from FSL in mm?
-
7. What is the depth to invert (outlet) measuring from FSL in mm?
TRANSPORT INTEGRITY CHECK
-
1. FINAL LOAD CHECK ALL ITEMS LOADED ACCORDING TO DRAWINGS AND PLANS, INC RISERS, SIKA FLEX, ETC
-
QA Supervisor to address the issue to fit out lead and get it fixed
-
2. ENSURE THE DRIVER HAS THE CORRECT DELIVERY ADDRESS AND IS AWARE OF ONSITE ARRIVAL TIME AND CONTACTS
-
QA Supervisor to address the issue to fit out lead and get it fixed
DRIVER CONTACT DETAILS
-
Name:
-
Contact phone #
-
DISPATCH DATE
-
Email link to PDF Report to nash@australiantanks.com