Information

  • Train ID

  • Locomotive Number

  • Conducted on

  • Location
  • Auditor

Inspection Items

  • 1. Are horn and bell inspected for damage and defects. Per W-2102? <br>WARNING: DO NOT ACTIVATE HORN WHEN EMPLOYEES ARE IN CLOSE PROXIMITY. INSURE ALL ARE IN SAFE AREA WHEN HORN IS ACTIVATED, AND ONLY IN AREAS WHERE HORNS ARE PERMITTED TO BE ACTIVATED.

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 2. Are all (lead and trail) 2 Way Telemetry Equipment (HTD) tested and functionality verified per SMR X-2400-18 and W-2122?

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 3. Are crossing warning lights being checked for physical defects and proper operation? W-2137

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 4. Are speed indicators in lead and trail units being checked for speed indications as units are being moved and units with indicator problems qualified? W-2139

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 5. Are safety control devices being checked for proper operation, with wheels chocked or hand brake on? Following time out of safety control devices, did the brake pipe pressure reduce at a service rate and did the brakes apply on all locomotives in the consist? W-2141

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 6. Are jumper cables between units firmly secured in receptacles and cable hangers properly fastened? Are spare jumper cables secured in dummy receptacles? W-2175

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 7. Are one of each type MU hose coupled between units in consist, properly cut in and free of any air leaks? W-2176

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 8. Are cross boards in proper position and safety chains fastened with 6" maximum slack to ensure continuous barrier? W-2177

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 9. Are all sanders operational from controls of leading unit in consist and correctly aligned? Are forward and reverse directions checked for sand delivery? W-2178

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 10. Was an operational test made of the independent brake system using set-up and release? W-2179

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 11. Was an operational test made of the automatic brake system in consist by making service reduction, actuation release (bail off), further service reduction and brake release? W-2179<br>

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 12. Was brake leakage test performed on consist before dispatching? W-2179 (No more than 3 pound leakage per minute).

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 13. Was an emergency application of the brake system performed to insure automatic sanding and P.C. switches are operating properly? W-2179

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 14. Was section 1 of the Locomotive and Train Brake Test Certificate, form BTC100MT (latest revision) completed and placed on the control stand in the lead locomotive? W-2179

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 15. Is consist being checked in DB operation? Is proper number of traction motors cut in during operational check? W-2180

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 16. Is the proper number of available dynamic brake axles being calculated and annotated on section 5 of the Locomotive and Train Brake Test Certificate? W-2180

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 17. Are both front and rear headlights operating properly when turned on and both respond to dimming control from lead unit? W-2181

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 18. Are all units in consist responding to throttle movements when loading in both directions? W-2182

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 19. Is each unit in consist supplied with one each, hammer, 18" hose wrench, chisel and red flag? W-2183

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 20. Is each unit in consist supplied with a minimum of six and a maximum of twelve fusees? W-2183

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 21. Is each unit in consist supplied with one each "E" and "F" spare knuckle and properly secured? W-2183

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 22. Is each unit in consist supplied with the proper number of tags placed in torpedo compartment? W-2183<br>- 3 Non-compliance tags<br>- 3 Inoperative Dynamic Brake tags<br>- 6 Bad Order / Movement of Defective Car tags

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 23. Is each unit in consist supplied with one each Conductors car repair report, CSX form 1114EC placed with locomotive daily inspection / work report form? W-2183

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 24. Is each consist supplied with one car chain on proper holders? W-2183

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 25. Is each unit in consist supplied with 1 each spare trainline hose? W-2183

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 26. Are lead units of consist being supplied with ice if unit is equipped with an ice box? W-2183

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 27. Are lead units of consist supplied with 6 each crew packs and 6 eight oz. bottles of drinking water per crew member? W-2183

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 28. Are circuit breakers in proper position for lead/trail? W-2186 (SMR Appendix A)

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 29. Are Control/FP, ER and GF switches on control stands of all trailing units in consist placed in "OFF" position? W-2186

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 30. Are all independent brake handles in "OFF" position on all trailing units? W-2186

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 31. Are all automatic brake valve handles placed in "HANDLE OFF" position on all trailing units? W-2186

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 32. Is the FRA Blue Card form and air card properly completed, signed and dated? (229.23) <br>When applicable 184 day Q sticker must be applied to Blue Form holder and Mechanical Department Log Form 480-9000007-1 must be completed.

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 33. Are all doors and windows closed on each trailing unit of consist? W-2186

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 34. Are cab heaters turned on in all trailing units of consist during the months of September through April? W-2186

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 35. Are reverser lever handles on all trailing units in consist removed and placed in proper holders? W-2186

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 36. Are all locomotives being shut down when ambient temperature is 28 degrees or above? W-2186

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 37. If unit is equipped with an APU/ERM are the following switches in the proper positions: W-2191<br>- Is APU in "Auto cycle" on the APU control cabinet?<br>- Is ERM circuit breaker closed/on?<br>- Is APU battery charger circuit breaker (on the APU) on?<br>- Is ERM status light in the cab either red or green and not flashing?

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

  • 38. List separately any identified FRA defects not covered in this checklist.

  • Reviewed With Title / Name

  • Corrective Action

  • Completion Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.